169
10. Parameter List
10.1 User parameter list
Round bar
[ ]
1 Bar type
Hexagonal bar
[ ]
2. Bar diameter
mm
3. The number of times for
trying push new profile bar
pass through the chuck
times
Metal (Fe , Cu )
[ ]
4. Material selection
Aluminium( Al )
[ ]
1
Bar type /
Diameter
5. Push torque adjustment
%
2
Component
length
mm
Spindle length
mm
1. End of bar position
Clamping length
mm
New bar loading
Position
mm
2. Loading selection
loading without turret
[ ]
loading with turret
[ ]
Retract length
mm
3
Position
setup
3. push rod retract position
Fixed retract
position
mm
Sub spindle pull
(Double spindle
lathe work )
[ ]
Single fed
components
[ ]
Feed to
turret
[ ]
Multiple fed
components
[ ]
Min : mm
Feeding
against
moving
turret
Function
[ ]
Normal
feeding jobs
[ ]
End of bar
Position:
mm
4
Feeding
function
Barfeeding with /
without turret
Feed to
position
[ ]
Summary of Contents for MSV 80
Page 8: ...5 pusher maximum extension length Figure 1 Floor Plan ...
Page 9: ...6 Figure 2 Assembly Plan ...
Page 10: ...7 Figure 3 Manual Adjustments ...
Page 11: ...8 Figure 4 Changing Pushrod Piston ...
Page 12: ...9 Figure 5 Retracting The Barfeeder ...
Page 13: ...10 Figure 6 Transportation by forklift truck ...
Page 14: ...11 Figure 7 Transportation by crane hoist cables ...
Page 15: ...12 Figure 8 Greasing the Ball screw ...
Page 20: ...17 2 Operation Panel ...
Page 21: ...18 2 Operation Panel ...
Page 38: ...35 3 User Setup 3 5 1 Sub spindle Pull Select Sub spindle pull ...
Page 40: ...37 3 User Setup ...
Page 44: ...41 3 User Setup ...
Page 45: ...42 3 User Setup ...
Page 47: ...44 3 User Setup ...
Page 48: ...45 3 User Setup ...
Page 49: ...46 3 User Setup ...
Page 55: ...52 3 User Setup Select Back stop ...
Page 56: ...53 3 User Setup Auto back stop position P ...
Page 65: ...62 3 User Setup Touch on Detail button to review all setting data ...
Page 66: ...63 3 User Setup OR ...
Page 68: ...65 3 User Setup Setting Completed ...
Page 70: ...67 3 User Setup Setting Completed Touch on HOME symbol will jump to main screen ...
Page 72: ...69 3 User Setup 1 Eject new bar without Turret ...
Page 73: ...70 3 User Setup 2 Eject new bar with Turret ...
Page 84: ...81 4 System Setup ...
Page 97: ...94 4 System Setup ...
Page 115: ...112 4 System Setup ...
Page 125: ...122 5 History 5 2 Workpiece record Select 2 Workpiece record Feeding length history ...
Page 157: ...154 9 4 Electrical components distribution LS 4 S2 S1 S3 Q1 LS 3 LS 2 M2 AENC LS 1 SM1 S4 S6 ...
Page 158: ...155 9 5 Electric Circuit Diagram ...
Page 159: ...156 ...
Page 160: ...157 ...
Page 161: ...158 ...
Page 162: ...159 ...
Page 163: ...160 ...
Page 164: ...161 ...
Page 165: ...162 ...
Page 166: ...163 ...
Page 167: ...164 ...
Page 168: ...165 ...
Page 169: ...166 ...
Page 170: ...167 ...
Page 171: ...168 ...
Page 224: ...221 ...