
Performing maintenance
14. Close the drain valve.
15. Switch on the unit at the main switch.
16. Bleed the housing through the air bleed
screw in the cover.
Do not unscrew the air bleed screw
completely. It has ventilation slots.
Check the unit for any leaks.
17. The varnish exchanger column is ready
for operation.
VMU 1 ATEX II 2G IIC T4
en(us)
Page 43 / 68
BeWa VMU_1_ATEX-II2GIICT4_10000649233 en-us 2017-03-07.doc
2017-03-07