Performing maintenance / inspection
FAM 15/30/50/70 ATEX
en(us)
Page 67 / 96
BeWa FAM15-70 Atex 3193049h en(us) 2013-06-19
2013-06-19
Is the terminal chamber clean?
Is the connection performed correctly?
Are the cables and leads inserted properly?
Are all bolts and nuts tightened firmly?
Are cable entries and stopping plugs seated correctly?
Are all unused openings sealed with certified sealing elements?
Are all covers and partition plates associated with energized components in place
and firmly attached?
Is the ground wire connected?
Filling the seal chamber of the evacuation pump
Check the filling level of the reservoir to the seal chamber weekly; top off if
necessary.
For topping off, use the medium to be purified having a viscosity of ISO VG
10 … VG 100.