
1 | General
HYDAC FILTER SYSTEMS GMBH
10 / 124
BeWa CTU1x3x-CTU1x4x 4093420f en-us web
1.2.4 Representation of intermediate results/results
In the case of some activities, it is necessary to carry out work
steps with intermediate results and end results.
Intermediate results are the consequence of activities; they are
marked with an indented arrow.
End results represent the end of an activity and are represented
with a flag.
An example for a procedural instruction with intermediate result
and final result:
1. Switch the product on.
ð
The display lights up.
2. Press the button.
O
The product is now ready for use.
1
2
3
4
5
6
7
8
9
A
Summary of Contents for CTU 1 3 Series
Page 124: ...www hydac com ...