HYDAC International FPK Operating Manual Download Page 5

5

Charging & Gauging Units

PN#02068202

 • ACU1403-1605 / 03.14

ACCUMULATORS

Pressure Increase

When charging an accumulator that has 

an existing gas precharge, allow 5 to 10 

minutes for the gas temperature and thus 

pressure to stabilize.

FPS Unit

Turn T-handle clockwise until the gauge 

needle begins to deflect, then turn it another 

full turn. Proceed to “Filling”.

FPK Unit

Turn T-handle counter clockwise until the 

gauge needle begins to deflect, then turn it 

another full turn. Proceed to “Filling”.

FPK Unit

 

(with adapter FPK/SB)

Turn T-handle clockwise until the gauge 

needle begins to deflect, then turn it another 

full turn. Proceed to “Filling”.

Filling

Open the shut-off valve on the commercially 

available nitrogen bottle and slowly fill the 

accumulator with dry nitrogen gas.
Precharge very slowly until the pressure 

in the accumulator reaches 100 psi. Once 

100 psi is reached, the charging rate can 

increase. Charging too quickly may damage 

the accumulator.
Note: The gauge registers the line pressure, 

not necessarily the accumulator pressure 

while charging.
After allowing the appropriate time for 

the gas temperature and thus pressure to 

stabilize, adjust the gas precharge pressure 

as required, refer to “Pressure Increase” 

(see 

page 4)

 or “Pressure Release” 

(see page 3)

.

Once the desired gas precharge pressure  

is reached close the shutoff valve on the 

commercially available nitrogen bottle. 

Remove the charging and gauging unit from 

the gas valve as described under “Removal 

of Charging and Gauging Unit” 

(see page 5)

.

Removal of Charging and 

Gauging Unit

Close the shut-off valve on the commercially 

available nitrogen bottle before removing 

the charging and gauging unit.

FPS Unit

Turn T-handle counter clockwise until 

resistance is felt to close the gas valve. 

Open manual bleed valve to relieve pressure 

in the charging and gauging unit. Proceed to 

“Disconnecting”.

FPK Unit

Turn T-handle clockwise until resistance 

is felt to close the socket head cap screw, 

hand tighten. Open manual bleed valve to 

relieve pressure in the charging and gauging 

unit. Proceed to “Disconnecting”.

FPK Unit

 

(with adapter FPK/SB)

Turn T-handle counter clockwise until 

resistance is felt to close the gas valve. 

Open manual bleed valve to relieve pressure 

in the charging and gauging unit. Proceed to 

“Disconnecting”.

Disconnection

Unscrew the charging and gauging unit 

from the gas valve. Note: For FPK unit with 

adapter FPK/SB it may be necessary to 

loosen the connection between cap nut 

and the adapter to remove the charging 

and gauging unit. Check for leaks. None are 

permissible.

Completion

HYDAC gas valve version 1 

(see fig. 1)

 

Tighten socket head screw cap to 20 Nm  

(15 lb-ft), and screw on valve protection cap 

(where applicable)

; hand tighten.

HYDAC gas valve version 4 

(see fig. 1)

 

Screw on valve seal cap torquing to 30 Nm 

(22 lb-ft), and valve protection cap 

(where 

applicable)

; hand tighten.

Summary of Contents for FPK

Page 1: ...Accumulators Charging Gauging Units FPK FPS Operating Manual 1 877 GO HYDAC www HYDACusa com 1 888 99 HYDAC www HYDAC ca PN 02068202 ACU1403 1605 03 14 ...

Page 2: ...seal cap O ring Allen Wrench 6 mm to be used to crack open M8 SHCS T handle on FPK Charging is not robust enough to overcome recommended torque Valve protection cap where applicable O ring where applicable Socket Head Cap Screw M8 Seal ring T Handle T Handle Check Valve Cap Nut Cap Nut Manual Bleed Valve Manual Bleed Valve Figure 1 Figure 2 ...

Page 3: ...e at maximum operating temperature Operating and Installation Instruction Preparation To check the gas precharge pressure in an accumulator it must first be isolated from the system shut off and all hydraulic pressure relieved HYDAC gas valve version 4 see fig 2 Unscrew the valve protection cap where applicable and the valve seal cap HYDAC gas valve version 1 see fig 2 Unscrew the valve protection...

Page 4: ...d valve Release the gas precharge pressure very slowly until the desired gas precharge pressure is reached this insures that the gas temperature does not fluctuate greatly providing and accurate gas precharge pressure Close the manual bleed valve Allow the gas precharge pressure to stabilize 5 to 10 minutes recheck adjust if required Once the desired gas precharge pressure is reached please follow...

Page 5: ...utoff valve on the commercially available nitrogen bottle Remove the charging and gauging unit from the gas valve as described under Removal of Charging and Gauging Unit see page 5 Removal of Charging and Gauging Unit Close the shut off valve on the commercially available nitrogen bottle before removing the charging and gauging unit FPS Unit Turn T handle counter clockwise until resistance is felt...

Page 6: ...ange below 10 0 to 145 psi 00606759 25 0 to 350 psi 00606760 100 0 to 1400 psi 00606761 250 0 to 3500 psi 00606762 400 0 to 5800 psi 00606763 12 Check Valve 00610004 13 Manual Bleed Valve 00236445 23 O Ring FPS 00626488 O Ring FPK 00601049 2 5m Hose 00236514 4m Hose 00236515 10m Hose 00373405 ADAPTER G4 02068737 ADAPTER A3 FPK SB 00291533 O Ring ADAPTER A3 FPK SB 00601964 ...

Page 7: ...x2 Test Point A12 PN 03930191 M28x1 5 Vg8 A9 PN 02128638 M28x1 5 7 8 14UNF A3 ADAPTER FPK SB PN 00291533 M28x1 5 M16x1 5 A1 PN 00361619 M28x1 5 5 8 18UNF A2 PN 00361605 M28x1 5 7 8 14UNF A4 PN 00291536 M28x1 5 G1 4 A7 PN 02110629 M28x1 5 G3 4 A8 PN 02124524 M28x1 5 G3 4A A6 PN 02108819 M28x1 5 M8x1 A5 PN 00291531 A Adapters Gauge to Accumulator ...

Page 8: ...3 PN 02103421 Egypt Lebanon Israel Others W24 32x1 14 SW 32 40 G8 PN 02103425 G1 2 ISO 228 Brazil Chile Columbia Others SW 32 SW 32 G4 PN 02068737 81 W24 32x1 14 W24 5x1 14 seal ring A6x10 USA Canada Puerto Rico SW 30 SW 32 G9 PN 00241168 58 W24 32x1 14 M22x1 5 seal ring A6x10 Taiwan SW 32 SW 32 G5 PN 00236373 79 W24 32x1 14 W21 8x1 14 seal ring A6x10 Italy W24 32x1 14 SW 36 45 G10 PN 02103427 ISO...

Reviews: