1.6
4.
The six levelling plates should be lagged to the concrete floor with ¾” x 4¾” heavy duty concrete wedge anchors and
strong tack welds should be placed at all six areas.
As mentioned earlier, the conveyor should be leveled in both directions; across and along the infeed conveyor. Six level-
ing screws are provided, three down each length of the conveyor.
Leveling is checked by applying an accurate bubble level to the saw table, checking level both front-to-rear and side-to-
side. Lock the level using the jam nuts on the leveling bolts.
NOTE: Leveling the infeed conveyor with a slight slope towards the blade will prevent coolant from running down the raw
stock.
5.
At the barfeed front leg, connect hose 151 to the cap port of the shuttle lift cylinder and hose 152 to the gland port.
151
152
Tack Weld
Anchor
Summary of Contents for V-25APC
Page 2: ......
Page 13: ...0 9 ...
Page 16: ...0 12 ...
Page 59: ...4 1 ELECTRICAL SCHEMATICS SEE PDF ON ATTACHED CD SECTION 4 ELECTRICAL ...
Page 60: ......
Page 64: ......
Page 72: ...8 2 V 25APC 5 BARFEED LAYOUT SHEET 1 ...
Page 73: ...8 3 V 25APC 5 BARFEED LAYOUT SHEET 2 ...
Page 74: ...8 4 V 25APC 10 BARFEED LAYOUT SHEET 1 ...
Page 75: ...8 5 V 25APC 10 BARFEED LAYOUT SHEET 2 ...
Page 76: ...8 6 ...
Page 78: ......