1.4
BARFEED INSTALLATION
1.
The shipping weight of the barfeed is 5000 lb. Place one lifting sling around the front horizontal cross member located
28” back from the front of the conveyor. Place another sling around the cross member located 15” forward of the rear of
the conveyor. The slings should be about 2” to the right of the centre line of the conveyor (towards the movable jaw side).
Lift the barfeed and slide it into position towards the machine.
2.
Place the 6 levelling plates for the barfeed under each of the levelling bolts, then lower the barfeed to the ground in line
with the machine. Remove the cable trough, cable track, and the associated hoses and cords from the machine coolant
tray. Place the cable trough into position under the barfeed. Slide the cable track and bundle of hoses/cords under the
front end of the barfeed and into the cable track.
Levelling Plate
Summary of Contents for V-25APC
Page 2: ......
Page 13: ...0 9 ...
Page 16: ...0 12 ...
Page 59: ...4 1 ELECTRICAL SCHEMATICS SEE PDF ON ATTACHED CD SECTION 4 ELECTRICAL ...
Page 60: ......
Page 64: ......
Page 72: ...8 2 V 25APC 5 BARFEED LAYOUT SHEET 1 ...
Page 73: ...8 3 V 25APC 5 BARFEED LAYOUT SHEET 2 ...
Page 74: ...8 4 V 25APC 10 BARFEED LAYOUT SHEET 1 ...
Page 75: ...8 5 V 25APC 10 BARFEED LAYOUT SHEET 2 ...
Page 76: ...8 6 ...
Page 78: ......