background image

18

environment.

3. The insulation rod should be subjected to a withstand voltage test

before the first use, and an annual withstand voltage test

Factory configuration list

Item Name

Number of

single

machines

Number of

whole set

Aluminum alloy case

1pcs

2pcs

Receiving host

1pcs

2pcs

Launcher X

Y

2pairs

4pairs

Switchgear collector

1pair

2pairs

Telescopic insulation rod (3 meters) 2pcs

4pcs

Pointed terminal

2pcs

4pcs

Charger(5V/1A)

2pcs

4pcs

Self-test Line

2pcs

4pcs

Ground wire

2pcs

4pcs

Manual

1pcs

Fctory inspection report

1pcs

Certificate

1pcs

Reminder:

(1) The pointed terminal is a replacement for the hook on the transmitter

Summary of Contents for TAG-8000

Page 1: ...u can find the changes in the appendix Sorry for the inconvenience If you have further questions welcome to contact with our service department The input output terminals and the test column may bring...

Page 2: ...and prevent the product or other relevant subassembly to damage In order to avoid possible danger this product can only be used within the prescribed scope Only qualified technician can carry out main...

Page 3: ...d the instruction manual to acquire information about the ratings Do Not Operate without Covers Do not operate this product when covers or panels removed Use Proper Fuse Only use the fuse with type an...

Page 4: ...Security Terms Warning indicates that death or severe personal injury may result if proper precautions are not taken Caution indicates that property damage may result if proper precautions are not tak...

Page 5: ...Safety Precautions 7 Technical Parameters 8 Instrument Introduction 9 Short range phase detector 13 Remote Phase Detection 15 Result judgment and analysis 17 Maintenance 17 Factory configuration list...

Page 6: ...high voltage power test function The instrument adopts wireless transmission technology which is safe and reliable in operation and convenient to use and overcomes many shortcomings of the wired phas...

Page 7: ...s of the two lines Safety Precautions 1 During the field test the operation shall be carried out according to the safe distance standard for high voltage test of the power department 2 The standard co...

Page 8: ...teps 7 The 3 2 inch color screen displays the phase difference frequency vector diagram and in phase of two lines at the same time The results show the number of GPS satellites GPS timing status and t...

Page 9: ...eceiver s working power consumption is 0 3w 13 Working environment humidity 95 RH at 35 45 14 Machine weight about 3 6kg 15 Package size of the instrument length 56cm width 26cm height 13cm Instrument...

Page 10: ...of phase b B The same phase green light is on the two lines are in phase c C Charging red light is on charging d Charging green light is on fully charged Key 1 Long press to turn on or off 2 Short pr...

Page 11: ...ting that the line is live When starting 3 beeps indicate that the power is sufficient 2 beeps indicate that the power is available and all beeps indicate that the power is insufficient Please charge...

Page 12: ...Instrument self test method Connect the transmitter to the self test test line as shown in the figure below The transmitter starts the buzzer sounds and the red and green indicator lights flash altern...

Page 13: ...the self test phase difference is about 180 degrees reverse the plug of any self test line then the phase difference becomes about 0 degrees and vice versa Short range phase detector 1 Phase detectio...

Page 14: ...e live display then insert the DC end of the ground wire into the transmitter grounding hole also the charging hole the alligator clip is grounded and the receiving host powers on to select the short...

Page 15: ...e displays L1 L2 L3 and the bus is not necessarily correct If the nuclear phase result is abnormal the nuclear phase should be carried out on the primary line Remote Phase Detection Use two instrument...

Page 16: ...at the test site such as the underground power distribution room it is necessary to first connect the receiving host to the GPS satellite signal in the outdoor place where there is GPS signal and the...

Page 17: ...30 is the same phase the voice prompts in phase the screen displays in phase and the phase indicator is on All phase difference results refer to X and the degree is the phase in which Y is ahead of X...

Page 18: ...of whole set Aluminum alloy case 1pcs 2pcs Receiving host 1pcs 2pcs Launcher X Y 2pairs 4pairs Switchgear collector 1pair 2pairs Telescopic insulation rod 3 meters 2pcs 4pcs Pointed terminal 2pcs 4pcs...

Page 19: ...f sale of the instrument if there is any quality problem replace the new instrument free of charge 2 All quality problems of the instrument within 1 years shall be repaired by our company free of char...

Page 20: ...200 Impact resistance longitudinal MPa cm 147 Bending resistance longitudinal longitudinalresistance longitudinal MPa 343 Surface resistance coefficient 10x101 1 Volume resistance coefficient cm 10x10...

Page 21: ...ctromagnetic torque The quasi synchronous period is long but the impact is small Large generators should use quasi synchronous method From the same period in parallel first turn the wheel generator se...

Page 22: ...22 Advantages The juxtaposition process is relatively fast Short parallel time since the same period suitable for grid connection of small hydropower...

Reviews: