18
environment.
3. The insulation rod should be subjected to a withstand voltage test
before the first use, and an annual withstand voltage test
。
Factory configuration list
Item Name
Number of
single
machines
Number of
whole set
Aluminum alloy case
1pcs
2pcs
Receiving host
1pcs
2pcs
Launcher X
、
Y
2pairs
4pairs
Switchgear collector
1pair
2pairs
Telescopic insulation rod (3 meters) 2pcs
4pcs
Pointed terminal
2pcs
4pcs
Charger(5V/1A)
2pcs
4pcs
Self-test Line
2pcs
4pcs
Ground wire
2pcs
4pcs
Manual
1pcs
Fctory inspection report
1pcs
Certificate
1pcs
Reminder:
(1) The pointed terminal is a replacement for the hook on the transmitter