Huvema HU 40 GTF Super Vario Manual Download Page 13

 

 

11 

Fig.6

 

 

6.3 

Cleaning and Accessing the coolant system 

 

Cleaning is required when iron filings clog the screen 

(B,Fig.6) at the bottom right corner of the water drain entry at 

the base.  

 

Uncover the base plate (P, Fig.11). 

Loosen the screw (D, Fig.11) to remove the plate 

and the fixed pump on it. 

Remove the drain plug (C, Fig.12) at the rear wall of 

the base. 

Drain the coolant and clean out the iron filing in the 

tank. 

Please refer to the drawing C1 on the machine for clear 

indication.  

 

 

 

 

 

 

 

 

 

 

7  Lubrication and Routine Maintenance  

 

Apply oils to the driving parts of the machine prior to operation and supply coolant during operation to 

ensure stability of cutters and the object being processed. Please refer to the lubrication as below for 

more details about use oil. To extend your machine life, please make a maintenance schedule daily, 

weekly, monthly or semi-annual and annual. Neglecting the machine maintenance will result in 

premature wear and poor performance. 

 

7.1 

Lubrication 

 

Lubricate – Column, Quill and the nozzle as shown 
on P1 at the rear of the head as mentioned in 6.2. 
Use machine tool oil with light film of oil. 

Grease – Rack on the column so that the worktable     
can move up/down smoothly. Use SAE 20 oil. To 
clean rack with kerosene before applying oil. 

 
 

Gear Oil – Pay attention to the oil gauge at the mid 
left of the head.  Never allow the level below half of 
the gauge. Use oil type JUQUAN HYDRALIC R68 or 
equivalent oil. ESSO Sparten EP 68, Mobil 
Mobilgear 626 and Shell Morlina 68 are equivalent. 

3.1  Remove the cover (B76, Fig. 13) at the bottom of 

the machine and screws 3/8PT (B01, Fig. 13) to 
drain the oil during replacement. 

3.2  Remove the name plate (Fig.14) on the left side of 

the cover and the oil through the plastic tube. Fill the 
oil at least half way through the gauge at the left of 
the head. (minimum 2.5 liters) 

 

C1 

 

Fig.14 

P1 

Fig.13 

Fig.11 

Fig.12 

Summary of Contents for HU 40 GTF Super Vario

Page 1: ...HU 40 GTF Super Vario C O L U M N D R I L L I N G M A C H I N E...

Page 2: ...ating cutting tools Keep children away All visitors should be kept a safe distance from the work area Never leave the machine running unattended Turn the power off Do not leave the machine until it co...

Page 3: ...erence 10 6 3 Cleaning and Accessing the coolant system 11 7 Lubrication and Routine Maintenance 11 7 1 Lubrication 11 7 2 Daily Maintenance 12 7 3 Weekly Maintenance 12 7 4 Monthly Maintenance 12 7 5...

Page 4: ...hine s spindle is equipped with mechanical automatic down feed to set the drilling when handling large number of workpiece In terms of material the entire machine body including the base table and col...

Page 5: ...3 1 Description of Machine...

Page 6: ...ning After daily use disconnect machine from power source or press emergency stop switch to shut off the power completely Do not keep the machine connected over 24 hours it may cause damage to the mac...

Page 7: ...ing of coolant system 4 Machine Installation After unpacking please follow the steps below to install your machine 4 1 Positioning the Machine 1 Check to see if the head is secure to the column with 1...

Page 8: ...achine is 220V 1 phase or 220V 380V 400V 440V 3 phases prior to connection If the machine cannot be operated after wires have been connected please check the following items 1 Is the Emergency switch...

Page 9: ...t depth scale 1 Loosen the lock handle M Fig 7 and adjust the depth indicator 2 Lock the handle M Fig 7 to set the depth stop 3 Release the handle U Fig 7 For drilling in auto mode use the down feed d...

Page 10: ...epth stop will disengage the automatic down feed when the zero setting is reached The down feed lever will transfer to manual mode and return the drill to starting height 5 5 Using the micro feed hand...

Page 11: ...t the spindle speed F Fig 1 5 6 1 In Drilling Mode 11 Lock in manual mode or select automatic mode and feed rate Turn handle N Fig 9 or Refer to Automatic Down feed 5 4 12 Begin drilling 5 6 2 In Tapp...

Page 12: ...difficulty drilling or the spindle bounces automatically during the process of drilling stop operation right away and check if the bit is sharp or the material is too hard If the material is too hard...

Page 13: ...weekly monthly or semi annual and annual Neglecting the machine maintenance will result in premature wear and poor performance 7 1 Lubrication 1 Lubricate Column Quill and the nozzle as shown on P1 a...

Page 14: ...Disposal Oil products must be disposed in a proper manner following local regulations 7 9 Special Maintenance Special maintenance operations must be carried out by skilled personnel However we advise...

Page 15: ...verter Ensure the cooling device be free of any foreign objects or dirt O L The frequency converter detects the output exceeds 150 of normal standards for 1 minute Check if the motor is overloaded Ex...

Page 16: ...14 9 Drawings And Parts Lists 9 1 Explosion Drawing A Motor pulley assembly...

Page 17: ...et Cap Screw M8x35 4 B 36 B 3 Oil Seal T Pi 25x5 38 1 2 B 37 Taper Pin 5x38 2 B 38 Gear Box 1 B 39 Oil Fiter 3 8 x3 8 1 NO Description Size Q TY B 40 Tube 1 B 41 Oil Seal 62x35x10 1 B 42 C Clip R 47 1...

Page 18: ...16 9 3 Explosion Drawing B Head Spindle assembly...

Page 19: ...3 A 40 Screw M5x6 4 A 42 Set Knob 1 A 46 Hex Socket Cap Screw M6x16 1 A 47 Special Washer 1 A 48 Scale Ring 1 NO Description Size Q ty A 49 Hex Socket Cap Screw M6x16 3 A 50 Allen Wrench 1 A 51 Lock N...

Page 20: ...Gear Bracket 1 A 135 Hand Body 1 A 136 C Clip S 45 1 A 137 Ball Bearing 6009ZZ 2 A 138 Bearing Spacer 1 A 139 Spindle Sleeve M12x80 1 NO Description Size Q ty A 140 Key 3x10 1 A 141 Drive Spindle Pul...

Page 21: ...19 9 5 Explosion Drawing C Column Table Base...

Page 22: ...ear 1 C 26 Key 5x5x20 1 C 27 Worm Shaft 1 C 28 Thrust Bearing 51102 1 C 29 Key 5x5x60 1 C 30 Shaft 1 C 31 Hex Socket Cap Screw M8x35 3 C 32 C Clip S 25 2 NO Description Size Q ty C 33 Spring Pin 4x25...

Page 23: ...21 9 7 Explosion Drawing D Electric box...

Page 24: ...a Inverter for 460V 1 E 11 Washer M4 2 E 12 Screw M4x20 2 E 13 Washer M6 1 E 14 Hex Socket Cap Screw M6x16 1 E 15 Insulation Board 140x78x3 1 E 16 Fuse 0 5A 2 E 16A Fuse 3A 1 E 17 Washer M4 4 E 18 Scr...

Page 25: ...23 9 9 Explosion Drawing E Control Panel...

Page 26: ...ket 1 D 11 Washer M8 2 D 12 Hex Socket Cap Screw M8x20 2 D 14 Screw M5x8 2 D 15 Oil Filer Cover 1 D 16 Cross Head Screw 3 16 x3 8 2 D 17 Washer 3 16 4 D 18 Cross Head Screw 3 16 x3 8 4 D 19 Top Cover...

Page 27: ...V 220 240V 2HP 1 DALTA VFD M CE BR Braking resistors 200W 400 200W 70 1 DALTA CE VR Adjust speed switch 1 DALTA RV 24YN20S B152 SB3 SB2 Push buttons on Stop 600V PL 24V 1a 250V 10A 1b 1 1 MACK BFL 22G...

Page 28: ...26 9 12 Electrical Drawing Wiring Diagram...

Page 29: ...e Manufacturer and importer assume no responsibility for defects which result from not reading the manual carefully or wrong use of the machine No rights can be derived from this manual All rights res...

Page 30: ...2018 V1...

Reviews: