Q2SSM-R Merchandisers
MERCHANDISER LEVELING
Be sure to position merchandisers properly.
Level the merchandiser by all four corners.
Merchandiser(s) must be installed level to
ensure proper operation of the refrigeration
system, and to ensure proper drainage of
defrost water.
All cases were leveled and joined prior to
shipment to insure the closest possible fit when
cases are joined in the field. When joining, use
a carpenters level and adjust legs accordingly.
The legs on the Q2-SSM are adjustable and do
not require shims. Simply screw the leg up or
down to adjust height.
INSTALLATION
1. Using case blueprints, measure off and
mark on the floor the exact dimensions of
where the cases will sit. Snap chalk line
for front and back positions of base rail or
pedestal. Mark the location of each joint front
and back. Find the highest point throughout
the lineup.
FLOORS ARE NORMALLY NOT LEVEL!
Determine the highest point of the floor; cases
will be set off this point. All cases in the entire
lineup must be brought up to the highest level
of the case sitting at the highest point in the
lineup. This may be done a few different ways.
a. Walk the floor looking for any mounds or
dips.
b. Use a string level.
c. Use a transit.
If a wedge is used in the middle of a lineup,
the wedge must be set on the highest point on
the floor FIRST, with the rest if the lineup
being leveled from it. The Q2-SSM case has
adjustable legs to allow for leveling.
2. Set first case over the highest part of the
floor and adjust legs so that case is level.
Remove side and back leg braces after case is
set and joined.
3. Set second case within one foot (1’) of
the first case, and remove leg skids. Keep the
supports along the length of the case and far
end of case. Level case to the first using the
instructions in step one.
4. Apply masking tape 1/8
"
in from end of
case on inside and outside rear mullion and
body work on both cases to be joined.
5. Apply liberal bead of case joint sealant
(butyl) to first case. Sealant area is shown
using a dotted line in illustration in Step 8.
Apply heavy amount to cover entire shaded
area.
DO NOT USE PERMAGUM!
6. Slide second case up to first case snugly,
then level.
7. To compress butyl at joint, use two
Jurgenson wood clamps. Make sure case is
level from front to back and side to side on
inside bulkheads at joint.
This equipment is to be installed to
comply with the applicable NEC,
Federal, State , and Local
Plumbing and Construction Code
having jurisdiction.
ATTENTION
INSTALLER
Do not use bolt to pull cases together.