11 TUNING THE CHASSIS
44
11.15
Handlebar position
800116-10
On the upper triple clamp, there are 2 holes at a distance of
to each other.
Hole distance A
15 mm (0.59 in)
The holes on the handlebar support are placed at a distance of
from the center.
Hole distance B
3.5 mm (0.138 in)
The handlebar can be mounted in four different positions. This allows the handlebar
to be mounted in the most comfortable position for the rider.
11.16
Adjusting the handlebar position
0
0
2
2
0
0
1
1
0
0
2
2
1
1
B00375-10
–
Remove screws
. Remove the handlebar clamp. Remove the handlebar and
lay it to one side.
Info
Cover the components to protect them against damage.
Do not bend the cables and lines.
–
Remove screws
. Remove the handlebar support.
–
Place the handlebar support in the required position. Mount and tighten
screws
.
Guideline
Screw, handlebar support M10
40 Nm
(29.5 lbf ft)
Loctite
®
243™
Info
Position the left and right handlebar supports evenly.
–
Position the handlebar.
Info
Make sure the cables and wiring are positioned correctly.
–
Position the handlebar clamp. Mount and tighten screws
.
Guideline
Screw, handlebar clamp
M8
20 Nm (14.8 lbf ft)
Info
Ensure that the gap widths are even.