
F1.29
NUDA 900 2012/2013 - NUDA 900 R 2012/2013
H10300
1
2
H10301
3
Workshop Manual Ed. 11-2011
GENERAL ENGINE PROCEDURES
TIMING CHAIN REMOVAL/REPLACEMENT
(ENGINE REMOVED)
Perform the following operations, as described in the relevant paragraphs, before
disassembling the timing chain:
- Drain the engine oil.
- Remove the oil filter.
- Remove the starter motor.
- Fix the engine to the engine mount.
- Remove the spark plug recess ignition coil .
- Remove the head cover.
- Check valve clearance.
- Fix the engine on the top dead centre of the ignition.
- Remove the camshaft bearing mount.
- Remove the chain tensioner.
- Remove both camshafts.
- Remove the timing chain slider.
- Remove the chain sprocket.
- Remove the oil sump.
- Remove the swing arm housing cover.
- Remove the right engine crankcase cover.
- Release the fastening at the top dead centre.
- Remove the gearbox lever.
- Remove the left engine crankcase cover.
- Remove the selector shaft.
- Remove the lower part of the crankcase.
- Remove the gearbox output shaft oil seal.
Removal:
- Mark the installation position of the two caps (2) before removing them.
- Upon reassembly, the caps must be inverted.
- Remove the screws (1) and the two caps (2).
- Move the crankshaft (3) upwards, creating a slight rotary movement and
support it at the base with a suitable tool.
Summary of Contents for NUDA 900 2012
Page 1: ...NUDA 900 2012 2013 NUDA 900 R 2012 2013 Workshop Manual Ed 11 2011 Rev 02 ...
Page 6: ......
Page 18: ......
Page 19: ...B 1 NUDA 900 2012 2013 NUDA 900 R 2012 2013 B Workshop Manual Ed 11 2011 MAINTENANCE Section ...
Page 22: ......
Page 32: ......
Page 60: ......
Page 146: ......
Page 162: ......
Page 186: ......
Page 210: ......
Page 284: ...M 4 NUDA 900 2012 2013 NUDA 900 R 2012 2013 ELECTRICAL SYSTEM Workshop Manual Ed 11 2011 ...
Page 286: ......
Page 290: ...M 10 NUDA 900 2012 2013 NUDA 900 R 2012 2013 ELECTRICAL SYSTEM Workshop Manual Ed 11 2011 ...
Page 342: ......
Page 350: ......