
F1.21
NUDA 900 2012/2013 - NUDA 900 R 2012/2013
H10272
1
2
3
4
6
5
5
H10273
7
9
8
4
H10275
12
11
H10452
10
Workshop Manual Ed. 11-2011
GENERAL ENGINE PROCEDURES
COOLANT PUMP REMOVAL/INSTALLATION
Removal:
- Drain the coolant as indicated in the relevant paragraph.
- Open the pipe clamps (1) using a suitable tool and disconnect the pipes (2)
from the radiator (3) and from the pump cover (4).
- Open the pipe clamps (5) using a suitable tool and disconnect the pipes (6).
- Unscrew the screws (7) paying attention to the washer (8).
- Remove the pump cover (4) with the gasket (9).
- Use a suitable tool to disassemble the impeller (10) (right hand threading).
- Unscrew the screw (11).
- Remove the pump body (12) using a suitable tool.
Summary of Contents for NUDA 900 2012
Page 1: ...NUDA 900 2012 2013 NUDA 900 R 2012 2013 Workshop Manual Ed 11 2011 Rev 02 ...
Page 6: ......
Page 18: ......
Page 19: ...B 1 NUDA 900 2012 2013 NUDA 900 R 2012 2013 B Workshop Manual Ed 11 2011 MAINTENANCE Section ...
Page 22: ......
Page 32: ......
Page 60: ......
Page 146: ......
Page 162: ......
Page 186: ......
Page 210: ......
Page 284: ...M 4 NUDA 900 2012 2013 NUDA 900 R 2012 2013 ELECTRICAL SYSTEM Workshop Manual Ed 11 2011 ...
Page 286: ......
Page 290: ...M 10 NUDA 900 2012 2013 NUDA 900 R 2012 2013 ELECTRICAL SYSTEM Workshop Manual Ed 11 2011 ...
Page 342: ......
Page 350: ......