12 SERVICE WORK ON THE CHASSIS
59
K00602-10
Main work
–
Open the cable holder in front of the right radiator and detach
the wiring harness.
–
Remove screws
1
and hang the voltage regulator to the
side.
–
Open the cable holder in front of the left radiator and detach
the wiring harness.
S02074-10
–
Remove screw
2
.
–
Remove screw
3
.
–
Take off the upper triple clamp with the handlebar and set it
aside.
Info
Cover the components to protect them against dam-
age.
Do not kink the cables and lines.
F00278-10
–
Remove O-ring
4
and protective ring
5
.
–
Take off the lower triple clamp with the steering stem.
–
Remove the upper steering head bearing.
12.10
Installing the lower triple clamp
0
0
1
1
0
0
2
2
0
0
3
3
B01632-10
Main work
–
Clean the bearing and sealing elements, check for damage,
and grease.
High viscosity grease (
–
Position the lower triple clamp with the steering stem. Mount
the upper steering head bearing.
–
Check whether upper steering head seal
1
is correctly posi-
tioned.
–
Mount protective ring
2
and O-ring
3
.