
18 ENGINE
Position the clutch cover.
•
Info
176
I
Ensure that the shaft seal rings of the water pump and the crankshaft are
not damaged.
- Remove screw
O.
- Mount screw @ with the washer but do not tighten yet.
Guideline
I
Screw, clutch cover
I
M6x25
- Mount screws
(D
but do not tighten yet.
Guideline
I
Screw, clutch cover
I
M6x40
- Tighten all screws in a crisscross pattern.
110 Nm (7.4 lbf ft)
110 Nm (7.4 lbf ft)
18.5.18 Installing the water pump cover
18.5.19 Installing the starter drive
- Mount the two-part water pump impeller
O.
- Mount and tighten nut@.
Guideline
Nut, water-pump wheel
M6
5Nm
(3.7 lbf ft)
- Mount the water pump cover with the seal ring.
•
Info
I
Ensure that the dowel pins are seated properly.
- Mount screw
(D
but do not tighten yet.
Guideline
I
Screw, water pump cover
I
M6x25
- Mount screws
8
but do not tighten them yet.
Guideline
I
Screw, water pump cover
I
M6x40
- Mount screw
0
with the washer but to not tighten yet.
Guideline
I
Screw, water pump cover
I
M6x25
- Tighten all screws in a crisscross pattern.
- Grease the O-ring of the starter motor.
- Position the starter motor.
- Mount screws
0,
but do not tighten yet.
Guideline
I
Screw, starter motor
Loctite
®
243
™
110 Nm (7.4 lbf ft)
10 Nm (7.4 lbf ft)
10 Nm (7.4 lbf ft)
10 Nm (7.4 lbf ft)