
Incounter stacking equipment
Operating instructions
15 / 28
Information on the layout of cut-outs and supports and the necessary
assembly work can be found in the separate assembly instructions.
Electrical connection
Depending on the equipment and the installation
position, the thermostat may not be accessible during
operation.
−
Adjust the thermostat during installation.
The electrical connection is made via a connection at the installation
site. The switches are installed separately in the same counter. For
information on the layout of the connection and connection diagrams,
please refer to the separate assembly instructions.
The connection must be made by a trained electrician.
6
Commissioning
NOTICE
Instructing operating staff
Before commissioning, operating staff must be instructed how to
operate the transport cart correctly.
Help protect our environment. Separate the pack-
aging materials and recycle them. Dispose of:
−
Packaging and foils in the (yellow) recycling bin.
−
Cardboard boxes and paper in the paper recy-
cling bin.
Clean the equipment thoroughly before first use (see cleaning instruc-
tions).
Check the functions of the equipment:
■
Functionality of all mechanical parts
■
Functionality of the locks
Calculating the capacity
It is possible to calculate how many items stacking equipment can
hold.