Check before departure & when parking
Operation
57
3
Departure check
–
Trailer has been correctly coupled.
–
The brake and supply line have been
connected.
–
The electrical cables and EBS cables
have been connected.
–
The air suspension system for the
lifting / lowering system is at driving
level.
–
The operating lights (if any) have
been switched off.
–
The cargo bed has been tilted back
and secured in the tilting bearings.
–
The hydraulic line is connected to the
towing vehicle.
–
Parking brake has been released.
–
The support devices have been
extended upwards and secured.
–
The underride protection is in the
driving position and secured.
–
The drop sides have been closed and
secured.
–
Toolbox has been locked and
secured.
–
The wheel chocks have been
secured in the holders.
–
The night parking warning signs have
been closed.
–
The steps (if any) have been folded
up and secured.
–
The roll-up tarpaulin, cover net or
tarpaulin (if any) have been mounted
and secured.
–
The central locking systems have
been closed.
Check when parking
–
Trailer has been correctly uncoupled.
–
Parking brake has been applied.
–
Wheel chocks have been positioned.
–
The support devices have been
extended and secured.
–
The brake and supply lines have
been disconnected and parked.
–
The electrical cables and EBS cables
have been disconnected and parked.
–
The cargo bed has been tilted back
and secured in the tilting bearings.
–
The hydraulic line has been
disconnected and parked.
–
The drop sides have been locked.
–
Toolbox has been locked.
–
Night parking warning signs have
been folded out if necessary.
Summary of Contents for 10000 Series
Page 6: ...Contents 4 ...
Page 11: ...9 1 Safety ...
Page 28: ...Personal protective equipment rules prohibitions 26 Safety 1 ...
Page 29: ...27 2 General information ...
Page 39: ...37 3 Operation ...
Page 61: ...59 4 Operating the chassis ...
Page 102: ...100 Operating the chassis Warning tables optional 4 ...
Page 103: ...101 5 Operating the body ...
Page 144: ...5 Roll up tarpaulin optional 142 Operating the body ...
Page 145: ...143 6 Electrical system ...
Page 158: ...6 TIM iTAP 156 Electrical system ...
Page 159: ...157 7 Inspection care and maintenance ...
Page 218: ...7 Disposal 216 Inspection care and maintenance ...
Page 219: ...217 8 Troubleshooting ...