7
Cleaning / care
210
Inspection, care and maintenance
Galvanised steel surfaces
Galvanised surfaces / components
(e.g. chassis, tow bar) must first oxidise
in order to develop corrosion protection.
This may take several months.
A corrosion protection layer has only
been formed when the surface has lost
its zinc gloss.
White rust may form on zinc-coated
surfaces.
This is promoted by wetness / high air
humidity and substances such as grit.
White rust is not a fault or damage to the
surface - it cannot be prevented by the
zinc-coating workshop and is therefore
no basis for warranty claims.
Immediately clean the zinc-coated
components with clear water after
they have come into contact with
aggressive substances.
Let the surfaces dry out well.
For white rust treatment:
Clean the affected areas with lots of
clear water and thoroughly dry them.
Remove the white rust stains with a
nylon brush.
Apply zinc protection (zinc spray) to
the affected areas.
Seal the surfaces with wax as
required.
Painted and powder-coated steel
surfaces
Painted surfaces / components
(e.g. cargo bed, drop sides) provide
moderate corrosion protection.
Painted surfaces / components that are
directly exposed to the effects of brake
dust, loose chippings, de-icing salt, sand,
etc. require particularly intense care - to
make the painted surfaces look visually
appealing and to protect them
permanently against corrosion.
Clean the painted surfaces after every
exposure to surface-corroding
substances.
Let the surfaces dry out well.
Seal the surfaces with wax as
required.
Paint damage (chipped off, scratched)
on the surface should immediately be
mended by qualified specialist
personnel.
Summary of Contents for 10000 Series
Page 6: ...Contents 4 ...
Page 11: ...9 1 Safety ...
Page 28: ...Personal protective equipment rules prohibitions 26 Safety 1 ...
Page 29: ...27 2 General information ...
Page 39: ...37 3 Operation ...
Page 61: ...59 4 Operating the chassis ...
Page 102: ...100 Operating the chassis Warning tables optional 4 ...
Page 103: ...101 5 Operating the body ...
Page 144: ...5 Roll up tarpaulin optional 142 Operating the body ...
Page 145: ...143 6 Electrical system ...
Page 158: ...6 TIM iTAP 156 Electrical system ...
Page 159: ...157 7 Inspection care and maintenance ...
Page 218: ...7 Disposal 216 Inspection care and maintenance ...
Page 219: ...217 8 Troubleshooting ...