10/16
Preparing the drawers. Align the holes in the part 12, screw bolt A
into the part 12 by screwdriver.
Assemble the drawer handler on the part 12 as the picture show.
insert the hardware F into the part 8, 9,10
as the picture show, screw in the E
and fully tighten.
Installing the hardware Q on the part 1
both sides as the picture show.