Chapter 2 • Preparing for the Installation
1037106-0001 Revision B.03-Draft
15
Conducting the site
survey
Survey the remote site to confirm that it fulfills all the
requirements for using the HX system. This includes confirming
that there is an unobstructed line-of-sight to the appropriate
satellite.
In addition, review the installation specification or work order for
site-specific instructions.
CAUTION
• Do not block any ventilation openings. Do not install near
heat sources, such as radiators, heat registers, ovens,
stoves, or other apparatus (including amplifiers) that
produce heat.
• Recommended ventilation space around the top and
sides of the remote terminal assembly should be
approximately 6 inches. Ventilation is necessary to avoid
overheating.
Summary of Contents for HX100
Page 12: ... Figures xii 1037106 0001 Revision B 03 Draft ...
Page 14: ... Tables xiv 1037106 0001 Revision B 03 Draft ...
Page 34: ...Chapter 2 Preparing for the Installation 16 1037106 0001 Revision B 03 Draft ...
Page 42: ...Chapter 3 Installing the Hardware 24 1037106 0001 Revision B 03 Draft ...
Page 60: ...Chapter 4 Commissioning the HX50 HX100 Remote Terminal 42 1037106 0001 Revision B 03 Draft ...
Page 68: ...Chapter 5 Completing the Installation 50 1037106 0001 Revision B 03 Draft ...
Page 86: ...Chapter 6 Troubleshooting 68 1037106 0001 Revision B 03 Draft ...
Page 106: ...Chapter 7 The System Control Center 88 1037106 0001 Revision B 03 Draft ...
Page 128: ...Appendix C Disabling a Web browser s proxy connection 110 1037106 0001 Revision B 03 Draft ...