Prerequisites for installing the router
The following are required before you can install, commission, and register the satellite router:
• The antenna and radio assembly must be installed, as instructed in the antenna installation
guide. (However, you
point
the antenna as part of the router commissioning process, which
is explained later in this installation guide.)
• The IFL cables must be installed and connected to the satellite router and to the radio
assembly (LNB and transmitter).
See also
Items required for installation
on page 8 and
on page 11.
Selecting the router installation location
Select a location for the satellite router that will accommodate all required cable connections,
including connection to the power source.
Ventilation and heat sources
Make sure the installation location meets the following requirements concerning ventilation and
heat sources.
• Do not block any of the router’s ventilation openings.
• Leave 6 inches of space around the top and sides of the router to ensure adequate ventilation
and prevent overheating.
• Do not place the router near a heat source such as direct sunlight, a radiator, heat register
or vent, oven, stove, amplifier, or other apparatus that produces heat.
Router operating position
Install and operate the HN9400 router only in the upright vertical
position as shown in
Figure 4: HN9400 in vertical position
on page 17. Any other position
could result in insufficient ventilation, overheating, and malfunction.
HN9400 Satellite Router Installation Guide
16
1038554-0001 Revision B
Installing the satellite router
Chapter 3
Summary of Contents for HN9400
Page 1: ...1038554 0001 Revision B March 2 2011 HN9400 Satellite Router Installation Guide ...
Page 10: ......
Page 16: ......
Page 26: ......
Page 34: ......
Page 68: ......
Page 74: ......
Page 92: ......
Page 120: ......
Page 124: ......
Page 128: ......
Page 134: ...HN9400 Satellite Router Installation Guide 122 1038554 0001 Revision B Index ...