background image

Wiring Device - Kellems
Hubbell Incorporated (Delaware)
Shelton, CT 06484
1-800-288-6000
www.hubbell-wiring.com

GANGABLE WALLBOX   Installation Instructions

ENGLISH

PD2626

09/14

CAUTION:  RISK OF ELECTRICAL SHOCK.  Disconnect power before installing or servicing. 
NOTICE:  For installation by a qualified electrician in accordance with all national and local electrical codes, 
communications standards, the following instructions and any instructions included with individual devices.
NOTICE:  Insure data/communications circuits are separated from lighting/power circuits in accordance with the NEC  
and CE Code requirements.

If installing a 2 or 3 gang box, go to step 5.
For installations requiring more than 3 gangs, remove screws [1] 
and side [2] from one end of the box.
Install 3 gang [3] or 2 gang [4] center sections as needed using 
screws provided.  Center sections can be installed with 2 inch trade 
KOs oriented up or down. 
Reinstall box side to end of center section with screws provided. 
Position mounting brackets [5] on box sides.  Position brackets for 
proper finished wall thickness, aligning the bracket edge with 
marking.  Secure brackets to box sides using screws provided. 
Attach far wall support [6] to side bracket and secure with screw.  
Position of far wall support is based on stud bay depth.  Do not use 
far wall support for 3-1/2" stud bays.  
Torque all screws to 10 - 15 lbs-in torque [1.1 - 1.7 N m]. 
Remove knockouts as needed for wiring connections.  Do not leave 
any unused openings.
Install voltage partition [7], HBL989 (sold separately), if needed.  
Torque mounting screw to 10 - 15 lbs-in torque [1.1 - 1.7 N m]. 
Mount box to stud using appropriate fasteners, not provided.
Complete wiring per local codes.
 

1. 
2.
 
3.
 
 
4.
5.
 
 
6.
 
 
7. 
8.
 
9.
 
10.
11.
 

2

1

3

5

6

7

3

4

Catalog No. Gangs Total Volume
HBL985
HBL986

2

79 in  [1293 cm ]

54 in  [884 cm ]

3

HBL988

HBL987

4
6

104 in  [1702 cm ]
154 in  [2520 cm ]

Reviews: