background image

Revised 06/26/12             EC 120626005             Status 14

Part No. 95268

B30 Series 8

"

Round Traditional Bollard 

Installation & Maintenance Instructions

P.O. Box 60080 • 16555 East Gale Ave.

City of Industry, California 91716-0080

626/968-5666 • FAX 626/330-3861

WARNING: Fixtures must be grounded in accordance with local codes or the National Electrical Code.  

Failure to do so may result in serious personal injury.

MAINTENANCE WARNING: To maintain light efficiency and prevent fixture overheating, reflector and lens must

be kept clean and free of dirt, dust, leaves, and trash.  For optimum performance a regularly scheduled

maintenance program should be followed.
CAUTION:  All wiring must be done by a qualified electrician.  KEEP THIS SHEET FOR FUTURE REFERENCE.

B30

8

Round 

T

op Cover/

Lens Assembly

Reflector

Assembly

Socket/Base

Assembly

Riser

(Pole Body)

Base/Ballast

Bracket Assembly

Base Casting /  Ballast Assembly Installation:

Make certain the electrical supply is 

OFF 

before starting installation.

1. Install the base casting/ballast assembly on the pre-set anchor bolts.  Use flat washers

and hex nuts both below and above the base casting.

2. Level the top edge of the casting by adjusting the bottom leveling nuts.  Tighten the

upper nuts.

3. Connect the circuit ground wire to the grounding lug on the ballast bracket.

4. Connect power supply leads to the ballast input leads.  See diagram below.  

NOTE:

For incandescent fixtures, connect the power supply leads directly to the lamp leads -

no ballast required

.

ATTENTION: 

If your fixture is equipped with a multi-tap ballast and if no voltage was specified on the purchase order,

the ballast has been wired for operation on a 277 volt circuit (347v in Canada).  If other than 277 volts is required, i.e.

120v, 208v, 240v, connect incoming voltage lead to selected voltage lead on ballast.  Cap off all unused voltage leads.

Tools Required:

Ratchet with 

N

" Deep Socket

F

" Hex Key

B

" Hex Key

N

" Open-end Wrench

Flat Blade Screwdriver

Fixture Installation:

Make certain the electrical supply is 

OFF

before starting 

fixture installation.  

1. To protect finish, lay fixture horizontally on soft cloth with open-

end of fixture next to installed base casting/ballast assembly.

2. Connect fixture ground lead (green) to the short green wire con-

nected to the grounding lug on the ballast bracket.

3. Connect the lamp leads to the ballast.  

NOTE:

For incandescent

fixtures, connect the power supply leads directly to the lamp leads.

4. Place pole body over ballast assembly and slowly turn until body

drops into retaining slots, then twist clockwise to lock the pole onto

the base casting.

5. Tighten the two set screws at the bottom of the pole using a 

F

hex key.

LEVEL

3" Max.

Grade

Base Casting/ Ballast Assembly

Fixture Installation

Conduit 

(by others)

Anchor Bolt (4)

Concrete

In Concrete Pad

(Leveling)

Nut and

Washer (4)

Nut and

Washer (4)

Riser/

Pole Body

Base Casting/

Ballast Assembly

In Earth  

(grade slopes away)

Final Installation Detail

!

!

!

Reviews: