5
b.
Before it is going to testing a battery bank, it has to finish all testing of poles and
connectors of one battery, then start to testing next battery. First, test the poles, and
then test the connectors. When
finished testing of all poles and connectors of one battery, test the next cell battery
poles and connectors as the same direction.
III.Operation Rules
3.1 Fast test procedure
First step:
:
Press power button long time and release it until enter into
interface
.
Second step
:
setting
:
main interface “
” —“
”, enter into new
battery parameters setting interface.
Fig 3.1 Set test specification
Set machine room, technician, battery number
Set battery quantity (need the test battery quantity)
Battery manufacture selection:
1) Select “USER” then set single battery voltage, volume, reference internal
resistance according to battery specification.
2) If select other battery manufacturer then set these specification via menu.
Minimum voltage setting. During test if voltage is lower than this level device will
send alarm but won’t affect test.
Test mode: By manual or automatic
1) If manual test each change on test clip will request us to click “Start test” for next