I. Introduction

The DC resistance is the transformer’s semi-finished product, finished product test,

installation, commissioning test, and electric part prevention test necessary test

project,the transformer coil can effectively find the device welding, connecting parts loose,

missing unit, disconnection, and other manufacturing default and other hidden danger

occurred after operation.

The DC Resistance transformer to meet fast measurement requirement, we developed

HZ-3110 DC Resistance Tester. The instrument is a newpowerful technology, small size,

light weight, high output current and other characteristics.

The device is controlled by the microcontroller, with a high degree of automation,

automatic discharge functions. It is a test instrument of high precision, simple, direct way

to achieve fast transformer measurement.

II. Safety Measure

1. Before using this equipment you must carefully read the manual.

2. The equipment operator should have electric general knowledge.

3. Avoid putting the equipment in the contact of the rain, corrosive gas, dust, high

temperature, direct sunlight, and other places.

4. Severe vibration has to be avoiding for gauges.

5. Only an expert must maintain and adjust the equipment .

6. After the test, the user must wait till the discharge alarm stopped before switching off

the device, and plugging off the test cables.

7. To measure no-load regulating transformers, the user has to wait till the discharge

instructions alarm stops before switching stalls.

8. During testing, do not move the testing clamp and cables.

III. Configuration

1. Whole instrument controlled by high speed SCM, high automatic degree and simple

operation.

Summary of Contents for HZ-3110

Page 1: ...HZ 3110 Transformer DC Resistance Tester Huazheng Electric Manufacturing Baoding Co Ltd...

Page 2: ...s I Introduction 1 II Safety Measure 1 III Configuration 1 IV Technical Data 2 V Presentation Of The System 2 VI Test and Operating 3 VII Caution 9 VIII Guarantee and After Sales Service 9 IX Packing...

Page 3: ...It is a test instrument of high precision simple direct way to achieve fast transformer measurement II Safety Measure 1 Before using this equipment you must carefully read the manual 2 The equipment...

Page 4: ...ment is always working at minimum power state effective energy saving reduce heat 7 320 x240 matrix of ultra small pixel 65Ktrue color LCD 8 With calendar clock and power storage can store 1000 groups...

Page 5: ...S up key press the key after selecting the current The microcomputer control to realize all testing process I I Current output terminals I is the positive current I is the negative current V V Voltage...

Page 6: ...firm meanwhile insure a well connection of the earthing wire A Single phase testing method to see the following drawing B magnetic assisted connections see picture 3 to 5 suitable Y N d 11junction gro...

Page 7: ...5 Picture 3 4 5 respectively measure low voltage Rac Rba Rcb connection 2 Instrument operation instructions 1 The boot interface displays as shown in figure 1...

Page 8: ...d when the cursor is separated press the select key and the phase can be displayed cyclically between AB BC CA AO BO CO ab bc ca ao Bo and Co Press the start key to move the cursor to the tap press th...

Page 9: ...ding temperature press the start button to start measurement 2 After selecting the current press the start button to start charging LCD display charging After a few seconds Testing is displayed indica...

Page 10: ...select key to reduce data and press the start key to increase data 5 Move the cursor to the host parameters in figure 2 then press the select key to enter the interface as shown in figure 6 Figure 6 P...

Page 11: ...he range and select the suitable current and carry testing 4 After the test press RESET and winding device will disconnect the power supply discharge alarm Ammeters back to zero then restore status an...