3
(B)Zinc oxide test and menu operation method
1、After connecting the test line and turning on the power of the instrument,
the display interface is shown below:
2
、
Three-phase test setting interface
Press the three-phase test to enter the three-phase parameter setting interface;
After setting the parameters, press "Test" button to enter the test interface;