www.huayu-solar.com
[email protected]
Huayu(Ningbo)New Energy Technologies Co., Ltd.
For Our Home Energy Independence.
Page 1: ...www huayu solar com info huayu energy com Huayu Ningbo New Energy Technologies Co Ltd For Our Home Energy Independence...
Page 2: ...and Operation 4 1 LCD Overview and Brief Introduction 4 2 General Information Checking and Settings 4 2 1 General Information Display 4 2 2 Start the Settings 4 2 3 Time Settings 4 2 4 Battery Setting...
Page 3: ...up This manual is only intended for qualified electricians who are responsible to the installation commissioning and decommissioning of the inverter and system How to Use this Manual The user or quali...
Page 4: ...in the battery and the power is supplied to the load from the network at night It is suitable for the micro grid environment that needs quiet electricity at night In this mode 10 units can be connecte...
Page 5: ...e components as below are in good condition 06 05 Quick Installation USER MANUAL Battery 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Forbidden System Connections Without the micro grid mode version hardwar...
Page 6: ...Interface Battery RS485 CAN Grid PV PE PE 08 07 I 100ADC I 40A I n 30mA Sub RCD Breaker I n 30mA I 40A I n 30mA I n 50mA Inverter EPS UPS Load Inverter Battery Sub Breaker Main RCD Breaker Sub RCD Bre...
Page 7: ...drilling holes for installation DANGER 3 2 2 Clearance Requirements To ensure the inverter working normally and easy to operate there are requirements on available spaces of the inverter e g to keep...
Page 8: ...threaded sleeve on to connection terminal until both are locked tightly A Diameter 10 12 mm B Cross Section 3 4 mm C Strip Length 10 mm f 12 11 Cable Requirements Uninstall the UPS connector Con rm t...
Page 9: ...S Load DC Breaker Main RCD Breaker Sub RCD Breaker Sub RCD Breaker Lithium Battery Hoursehold Load PE PE RCD Breaker I 100ADC Connecting the AC output of HYH 3 6K AC to the grid and connecting the EPS...
Page 10: ...Rubber stopper Cable gland...
Page 11: ...et the NTC near the lead acid battery surface Step8 Catching the CT1 to the grid L line from grid and the direction is Grid House Catching the CT2 to the grid L line of the inverter output Battery NTC...
Page 12: ...code the system working mode code warning code and fault code 20 19 1 2 3 4 UPS EPS output information and data When UPS function is enabled this area will display UPS voltage frequency power etc in...
Page 13: ...will ashing press UP and Down buttons to change the month number and press Enter button to con rm and nish the month setting Down UP Set the Day When nished the months setting then the day number will...
Page 14: ...tery capacity could be 50Ah 100Ah 150Ah 200Ah and 250Ah Then press Enter button to con rm and nish the lead acid battery settings For Lithium ion Battery Select the Li ion option and press Enter butto...
Page 15: ...d nish the UPS voltage settings UPS Frequency Settings When con rmed and nished the UPS voltage settings then the UPS frequency area will ash press UP and Down buttons to select the UPS frequency to b...
Page 16: ...the battery stored energy then we need to enable the Force discharge function and make settings Press Return button to get into setting mode and press UP and Down button to select the Force Discharge...
Page 17: ...UPS short circuit UPS power reversed 1 Check UPS L N connection 2 Disconnect the UPS connector if the error still exist contact us...
Page 18: ...ail info huayu energy com Web www huayu solar com As the manufacturer of this inverter we provide the manufacturer warranty to our products to our users For detailed information please refer to the wa...