Figure 3-63
Mounting the USG in a cabinet
2
RUN
ALM
MGMT
CONSOLE
0
HDD0
HDD1
RST
EN
SYS
ALM
MODE
SPUA
EN
~100-240V
;50/60Hz,10A
ON
OFF
PAC-700W
A-L
ST
ATUS
~100-240V
;50/60Hz,10A
ON
OFF
PAC-700W
A-L
ST
ATUS
9 PWR
10 PWR
11
F
A
N
12
SPU
SPU
13
M6
2
Front
Rear
1
3.
(Recommended) For adjustable guide rail 21242247, fix the air baffle to the guide rail
with two M6 screws.
----End
Follow-up Procedure
Perform the following checks after the installation:
l
Ensure that the USG is placed securely inside the cabinet.
l
Ensure that the exhaust of the USG is not blocked by other objects.
3.5.2 Connecting a PGND Cable
Connecting the PGND cable of a USG6650/6660/6670/6680 correctly is a key measure of
surge protection and resistance to interference. Before using the USG6650/6660/6670/6680,
correctly connect the PGND cable.
Prerequisites
The USG has been installed inside a cabinet.
Context
Instruments required:
HUAWEI USG6000 Series
Hardware Guide
3 Hardware Installation
Issue 08 (2017-06-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
314