UPS5000-E-(350 kVA-800 kVA)
User Manual (50 kVA Power Modules)
3 Installation
Issue 05 (2018-01-08)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
77
Figure 3-22
Expansion bolt composition
(1) M12 bolt
(2) Spring washer
(3) Flat washer
(4) Expansion sleeve
Knock the expansion bolt into the hole until the expansion sleeve completely fits into the hole.
The expansion sleeve must be completely buried under the ground to facilitate subsequent
installation.
Figure 3-23
Installing an expansion bolt (unit: mm)
1.
Drill holes in the ground by using a hammer drill. The hole depth is 52 mm to 60 mm.
2.
Partially tighten the expansion bolt and vertically insert it into the hole. Knock the
expansion bolt using a rubber mallet until the expansion sleeve is fully inserted into the
hole.
3.
Partially tighten the expansion bolt.
4.
Remove the bolt, spring washer, and flat washer.