Figure 5-22 Installing a PSU filler
----End
Installing an AC PSU
NO TICE
● PSUs on the same server must be of the same model.
● Use dedicated power cables to ensure equipment and personal safety.
● Power cables are used only for dedicated servers. Do not use them for other
devices.
● Connect power cables of active and standby PSUs to different power
distribution units (PDUs) to ensure reliable system operating.
● Ground equipment before powering it on. Otherwise, high leakage current may
cause equipment damage.
Step 1 Wear an ESD wrist strap. For details, see
.
Step 2 Remove the PSU filler. See
.
TaiShan 200 Server
Maintenance and Service Guide (Model 2280)
5 Removal and Installation
Issue 04 (2020-01-16)
Copyright © Huawei Technologies Co., Ltd.
94