SUN2000-(55KTL, 60KTL) Series
User Manual
5 Electrical Connections
Issue 06 (2020-01-03)
Copyright © Huawei Technologies Co., Ltd.
56
Figure 5-31
Binding communications cables
Step 5
Tighten the sealing nut and seal the cable gland.
----End
5.8 Closing the Maintenance Compartment Door
Procedure
Step 1
Install the AC terminal cover.
Figure 5-32
Installing a cover
Step 2
Retrieve the support bar.