![Huawei Quidway NetEngine40E Configuration Manual - Reliability Download Page 467](http://html.mh-extra.com/html/huawei/quidway-netengine40e/quidway-netengine40e_configuration-manual-reliability_169453467.webp)
Procedure
Step 1
Run:
system-view
The system view is displayed.
Step 2
Run:
slave restart
The SMB is restarted.
----End
6.2.6 Checking the Configurations
By viewing the status of the AMB and SMB, you can check whether the configurations are
successful.
Prerequisites
The configurations of the system-level GR function are complete.
Procedure
l
Run the
display switchover state
command to check the status of AMB and SMB.
----End
Example
Run the
display switchover state
command to check the status of AMB and SMB.
<HUAWEI>
display switchover state
Slot 8 HA FSM State(master): realtime or routine backup.
Slot 7 HA FSM State(slave): receiving realtime or routine data.
6.3 Maintaining HA
This section describes how to maintain HA. The detailed operation includes monitoring the
operations status of HA.
6.3.1 Monitoring the Running of HA
By monitoring the operating status of HA, you can view information about HA during the
operation.
Context
In routine maintenance, you can run the following command in any view to display the running
of HA.
HUAWEI NetEngine80E/40E Router
Configuration Guide - Reliability
6 GR Configuration
Issue 02 (2014-09-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
450