For the EPL services supported by Ethernet switching boards, see
l
For the VCTRUNK binding requirements of the Ethernet switching boards, see
Requirements for Binding Paths with VCTRUNKs on Ethernet Boards
.
Procedure
Step 1
Configure the EPL services between user A1 and user A2 in end-to-end mode.
1.
Create a VC-4 server trail.
l
Choose
Service
>
SDH Trail
>
Create SDH Trail
from the Main Menu and set
parameters for the VC-4 server trail.
Table 4-17
Parameters of the VC-4 server trail between user A1 and user A2
Parameter
Value in This Example
Direction
Bidirectional
Level
VC4 Server Trail
Service Domain
SDH&RTN
Resource Usage Strategy
Protected Resource
Protection Priority Strategy
Trail Protection First
l
Double-click NE1 (source) and NE3 (sink) on the main topology to configure the source
and sink of the VC-4 server trail.
l
In the
Trail Settings
tab, configure
Explicit Node
and
Set Route Timeslot
.
Table 4-18
Parameters of the VC-4 server trail route between user A1 and user A2
Parameter
Value in This Example
Explicit Node
NE
NE2
NOTE
Right-click and choose
Add
from the shortcut
menu. In the
Add Explicit
Node
dialog box that is
displayed, select
NE2
.
Set Route Timeslot
Timeslot
1
NOTE
Click
Set Route Timeslot
.
In the
Set Route Timeslot
dialog box that is displayed,
set the VC-4 server trail
from NE1 to NE3 to VC4-1.
Other parameters
Default values
OptiX OSN 550 Multi-Service CPE Optical Transmission
System
Configuration Guide
4 Configuring Ethernet Services
Issue 02 (2011-06-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
4-57