
Figure 5-22
Anchor points on a plate (unit: mm)
CAUTION
To prevent inhalation or eye contact with dust, take adequate preventive measures when drilling
holes.
Step 3
Use a hammer drill to drill holes at the anchor points. You are advised to use the hammer drill
Ф12.
Step 4
Lead the bolt M6x80 through the installation plate and ceiling cover, and then socket to tighten
the bolt to a torque of 5 N•m, as shown in
.
LampSite
Installation Guide
5 Installing a pRRU
Issue 02 (2014-05-27)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
69