9 Installing Auxiliary Devices
Issue 02 (2015-06-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
135
Figure 9-12
Installing an ECC collector
Step 4
Install a power cable between the ECC and the PDU2000.
If an optional static transfer switch (STS) is installed, connect the ECC power cable to the STS to obtain
power if possible.
----End
9.1.5 Installing an NVR
Procedure
Step 1
Install the floating nuts by referring to
in
Step 2
Install the NVR in the cabinet using the mounting ears. Perform the same steps to install the
NVR as installing the ECC collector. For details, see
9.1.4 Installing an ECC Collector
----End
9.1.6 Installing and Connecting Monitoring Components
Install monitoring components to specified holes on the control skylight panel, as shown in