IDS1000-A Air-Cooled Container Data Center
All-in-One Maintenance Guide
5 Parts Replacement
Issue 01 (2016-01-10)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
75
Procedure
Step 1
(Optional) Remove the screws on the left of the PD510 electricity meter panel by using a
Phillips screwdriver and open the panel.
Step 2
Switch off the upstream circuit breaker of the PD510 electricity meter.
Step 3
Remove the terminal block from the PD510 electricity meter, and gently press the latch
outwards to remove the terminal block.
Step 4
Remove the faulty PD510 electricity meter, and install a new PD510 electricity meter, and
insert the latch.
Step 5
Install the removed terminal block, and ensure that the terminal block is connected properly.
Step 6
(Optional) Install the panel of the PD510 electricity meter.
Step 7
Switch on the upstream circuit breaker of the PD510 electricity meter.
Step 8
Configure the PD510 electricity meter by referring to the initial configuration table for the
PD510 electricity meter.
Step 9
Check whether the new PD510 electricity meter is working properly.
After power on, press buttons on the PD510 panel, and check whether the LCD displays information.
----End
Follow-up Procedure
Dispose of the removed PD510 that is confirmed faulty.
5.1.2 Replacing the MDU
Prerequisites
An MDU needs to be replaced.
A spare MDU of the same model is available and functional.
Impact on the System
None
Preparations
Tools: Phillips screwdriver, ESD box, or ESD bag
Material: spare MDU
Documents required: none
Skill requirement: power distribution system engineer
Procedure
Step 1
Remove the CAN and RS485_1 communications cables connected to the MDU, as shown by
1 in