FusionModule1000B Water-Cooled IT Solution
Commissioning Guide
9 Commissioning Core Components
Issue 02 (2017-01-10)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
93
Figure 9-12
Temperature and humidity setting screen
Step 4
Verify the temperature and humidity settings by referring to the 30 kW chilled water precision
air conditioner temperature and humidity initial configuration table.
If any initial configuration is inconsistent with the initial setting, change it to the initial
setting.
----End
9.2.3 (Optional) Commissioning Civil Air Conditioners
Prerequisites
The power-on commissioning for the upstream PDB of air conditioners is completed.
Preparations
Tools: none
Documents: documents delivered with the civil air conditioners, power supply and
distribution system diagram, cooling device layout diagram
Skill requirement: cooling engineer
For the diagrams, see the initial configuration parameter manual for the solution in use.
Procedure
Step 1
Switch on the input power circuit breakers for air conditioners in the upstream PDB to power
on the air conditioners.