Figure 4-16 Requirement for wrapping the electric heating belt
NO TICE
● The electric heating belt needs to be wrapped evenly on the drainpipe and
water refill pipe during onsite construction.
● Wrap the electric heating belt and then wrap the thermal insulation foam.
Ensure that the thermal insulation foam covers the temperature control switch
and temperature sensor probe. The thermal insulation foam must withstand a
temperature above 200°C.
4.3.6 Removing Transport Fasteners and Desiccant Bags
Procedure
Step 1 Remove the adjustable side panel of the compressor, and take out the desiccant
bag from the compressor.
Step 2 Open the electric control box and take out the desiccant bag from the box.
Step 3 Open the outdoor intake air filter and take out the desiccant bag from the
outdoor air intake compartment.
Step 4 Open the adjustable side panel and water barrier of the spray pump, and take out
the two desiccant bags from the spray pump compartment.
Step 5 Loosen the three transport fixing bolts of the compressor using a 13# solid wrench
and remove the sheet metal fasteners.