Figure 5-15 Removing sheet metal fasteners from a compressor
NO TE
● Do not remove the bolts.
● Keep the removed sheet metal fasteners properly for future transportation.
Step 6 Tighten the bolts on the compressors again to a torque of 12 N·m.
Step 7 Install the maintenance door for the compressors.
----End
5.5 Installing Cables
5.5.1 Precautions
●
Connections of all power cables, control cables, and ground cables must
comply with local electrical regulations, and the cable specifications should
comply with local cabling specifications.
●
For details about the maximum current, see the nameplate of the unit.
●
Check that the input voltage and frequency of the primary power supply meet
the requirements.
●
Only trained and qualified personnel are allowed to connect cables.
●
Before connecting cables, use a multimeter to measure the input voltage and
ensure that the power supply is disconnected.
●
All units must be reliably grounded before power-on.
●
Cables should be securely connected and free of contact with components,
such as the fan.
●
When laying out cables, ensure that the power cables and signal cables are
reliably separated and that electric and extra low voltage (ELV) cables are
bound separately.
●
Cable colors in this document are for reference only.
5.5.2 (Optional) Installing Signal Cables