7
Power-On Commissioning
7.1 Preparing for Power-On
Procedure
Step 1 Verify that the switch for the unit in the upstream power distribution frame (PDF)
is OFF.
Step 2 Verify that the input voltage meets the requirement.
D ANGER
Ensure that there is no reverse or open phase for the input power cable of the
unit. Otherwise, the unit may be damaged beyond repair.
Step 3 Verify that cables are correctly connected and the phase sequence is correct.
Step 4 If teamwork networking is required, verify that the teamwork cable is correctly
connected.
Step 5 If the cabinet is connected to the temperature and humidity sensor, check that the
cable connection and DIP switch settings are correct.
----End
7.2 Powering On the Unit
Step 1 Turn on the main switch of the unit. (For a unit with dual power supplies, turn on
both the active and standby power switches.)
Step 2 Turn on the upstream power input switch of the unit. The display module turns on
automatically.
Step 3 After the initial power-on, the Quick Settings screen is displayed. Log in as user
admin.
FusionCol8000-E240 Modular Indirect Evaporative
Cooling System
User Manual
7 Power-On Commissioning
Issue 03 (2021-04-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
101