background image

 
 

1 Regulatory Compliance Statement

 

Issue  () 

Huawei Proprietary and Confidential     

Copyright © Huawei Technologies Co., Ltd.

1-1

 

Regulatory Compliance Statement 

About This Chapter 

1.1    Declaration of Conformity to European Directives 

1.1 

Declaration of Conformity

 

to European Directives 

Figure 1-1

 

Declaration of Conformity to European Directives   

Summary of Contents for eA360 Series

Page 1: ...CPE eA360 Series User Guide Issue 01 Date 2014 07 30 HUAWEI TECHNOLOGIES CO LTD ...

Page 2: ...e customer All or part of the products services and features described in this document may not be within the purchase scope or the usage scope Unless otherwise specified in the contract all statements information and recommendations in this document are provided AS IS without warranties guarantees or representations of any kind either express or implied The information in this document is subject...

Page 3: ...ment describes the hardware functions installation configuration operation and maintenance OM of the eA360 series customer premises equipment CPE Product Version Product Name Product Version eA360 Series CPE V100R001 Intended Audience This document is intended for System engineers Product engineers Technical support engineers Issue 01 2014 07 30 This is the first commercial release ...

Page 4: ...ntenna Specifications 6 2 Hardware 7 2 1 eA360 Hardware 7 2 2 eA360 Cables 8 2 2 1 PoE Network Cable 8 3 Installation 10 3 1 Installation Preparation 10 3 2 Installation Procedure 11 3 2 1 Mounting on a Utility Pole 11 3 2 2 Mounting on the Wall 15 3 2 3 Cable Connection 20 3 3 Installation Check 23 4 Configuring the eA360 26 5 Maintenance 27 5 1 Maintenance Preparation 27 5 2 Fault Diagnosis 27 6...

Page 5: ...al area network LAN The eA360 series can connect to external concentrators and Ethernet switches or routers to set up a LAN with multiple computers When terminal devices on the LAN connect to the eA360 using network cables the terminal devices can provide data services Security services The eA360 series supports the firewall and PIN password which protects your computers when you access the Intern...

Page 6: ...loyed in wISP network They can also be deployed in industrial public security and enterprise network if the performance is acceptable to the network operator Figure 1 1 The eA360 deployed deployed in wISP network The eA360 provides a variety of data services such as LTE TDD wireless routing and converting LTE wireless data into wired Ethernet data and vice versa Figure 1 2 shows an application sce...

Page 7: ...nd Confidential Copyright Huawei Technologies Co Ltd 3 Figure 1 2 The eA360 deployed in industrial private networks The following example describes how to use the eA360 for video monitoring 1 Use a power adapter to supply power for the eA360 or video camera as shown in Figure 1 3 ...

Page 8: ...ected to a video camera 2 Use a network cable to connect the eA360 to an external device If the eA360 connects to a single device connect the power adapter directly to the eA360 If the eA360 connects to multiple devices connect the power adapter to a Hub or switch and then to the eA360 as shown in Figure 1 4 Figure 1 4 The eA360 connected to multiple devices ...

Page 9: ...5 LTE TDD 3400 MHz to 3600 MHz LTE TDD 3600 MHz to 3800 MHz External ports 1 Ethernet and voice interface RJ45 10 100Base TX Ethernet POTS and POE combined 1 USB interface for local maintenance only 1 SIM card slot LED indicator One POWER indicator One LAN indicator Three LTE signal strength indicators Transmit power LTE 19dBm 2 for 23dBm 2 for other Receiving sensitivity LTE 100 dBm 5 MHz eA360 1...

Page 10: ... It doesn t display to the user at the same time the user can t open the Wlan function The transmit power is 19 2dBm to the America area to meet the FCC IC authentication 1 4 Antenna Specifications Table 1 2 lists the eA360 antenna s specifications Table 1 2 eA360s LTE antenna specifications Item eA360 118 eA360 123 eA360 135 Band 1785 MHz to 1805 MHz Band 62 1880 MHz to 1920 MHz Band 39 2300 MHz ...

Page 11: ...right Huawei Technologies Co Ltd 7 2 Hardware About This Chapter This chapter describes the hardware and cables of the eA360s 2 1 eA360 Hardware This section describes the appearance ports and indicators of the eA360 Appearance Figure 2 1 shows the appearance of the eA360 Figure 2 1 eA360 appearance ...

Page 12: ... the ports of the eA360 Table 2 1 Ports on the eA360 Name Description PoE PoE port SIM card maintenance window Consists of the SIM card slot and USB port A SIM card is inserted into the SIM card slot The USB port is used for internal commissioning Nameplate Displays the identifier information of a vendor 2 2 eA360 Cables 2 2 1 PoE Network Cable The power over ethernet PoE network cable is an unshi...

Page 13: ...rmation The PoE network cable transmits data signals to the eA360 and provides DC power for the equipment Technical Specifications Table 2 2 lists the technical specifications of the PoE network cable Table 2 2 Technical specifications of the PoE network cable Name Description Color Black Outer diameter 6 8 mm Working temperature range 40 C to 75 C ...

Page 14: ...xceeded at the nearest road location Prerequisites Perform the following operations to inspect the goods delivered to the site 1 Unpack the equipment count the total number of items based on the packing list attached to each packing case and check whether each packing case is intact 2 Check whether the models and quantities are consistent with those specified on the Packing List 3 Record the seria...

Page 15: ... Phillips screwdriver M3 M6 Flat head screwdriver M3 M6 Claw hammer Utility knife Wire stripper Power cable crimping tool Cable cutter Adjustable wrench open end 32 mm Vise Hex key M5 M6 Phillips torque screwdriver Measuring tape Multimeter Marker diameter 10 mm 3 2 Installation Procedure 3 2 1 Mounting on a Utility Pole Prerequisites The eA360 and mounting components are ready as shown in Figure ...

Page 16: ...d Confidential Copyright Huawei Technologies Co Ltd 12 Figure 3 1 eA360 and mounting components Table 3 2 Mounting components No Name 1 Mounting frame 2 Hose clamp 3 CPE Context Figure 3 2 shows the flowchart for mounting the eA360 on a utility pole without an angle adjusting component ...

Page 17: ...Ltd 13 Figure 3 2 Flowchart for mounting the eA360 on a utility pole without an angle adjusting component Procedure Step 1 Open the SIM card maintenance window of the eA360 and insert the SIM card as shown in Figure 3 3 Figure 3 3 Installing the SIM card Step 2 Insert the hose clamp to the wall mounting frame as shown in Figure 3 4 ...

Page 18: ...are hole slightly kink the protruding part and insert it into the other square hole on the front of the unit Step 3 Install the hose clamp with the wall mounting frame on the utility pole and use a M6 hex key to rotate the screw on the hose clamp to adjust the length of the hose clamp until it is correctly connected as shown in Figure 3 5 If the hose clamp is too long cut off the extra part Apply ...

Page 19: ...wei Technologies Co Ltd 15 Figure 3 6 Installing the eA360 on the wall mounting frame Step 5 Tighten the wall mounting frame s screw as shown in Figure 3 7 Figure 3 7 Tightening the screw End 3 2 2 Mounting on the Wall Prerequisites The eA360 and mounting components are ready as shown in Figure 3 8 and Table 3 3 ...

Page 20: ...roprietary and Confidential Copyright Huawei Technologies Co Ltd 16 Figure 3 8 eA360 and wall mounting components Table 3 3 Wall mounting components No Name 1 Wall mounting screw 2 Mounting frame 3 CPE Context Figure 3 9 shows the flowchart for mounting the CPE on the wall ...

Page 21: ... 9 Wall mounting flowchart Procedure Step 1 Open the SIM card maintenance window of the eA360 and insert the SIM card as shown in Figure 3 10 Figure 3 10 Installing the SIM card Step 2 Hold the wall mounting frame tightly against the wall use a level to adjust the horizontal position and mark the fixing points with a marker as shown in Figure 3 11 ...

Page 22: ...ints Step 3 Use a drill with 8 mm drill bit to drill holes in the fixing points Then remove the dust from the holes and install the expansion bolts as shown in Figure 3 12 Figure 3 12 Installing the expansion bolt Step 4 Align the two fixing points with the bolts on the wall and tighten the expansion bolt s screw nut to fix the wall mounting frame as shown in Figure 3 13 ...

Page 23: ...d Confidential Copyright Huawei Technologies Co Ltd 19 Figure 3 13 Fixing the wall mounting frame Step 5 Fix eA360 to the wall mount frame using the dovetail groove as shown in Figure 3 14 Figure 3 14 Fixing the CPE Step 6 Tighten the wall mounting frame s screw as shown in Figure 3 15 ...

Page 24: ...ry and Confidential Copyright Huawei Technologies Co Ltd 20 Figure 3 15 Tightening the screw End 3 2 3 Cable Connection This section describes the procedure for connecting the eA360 cables Procedure Step 1 Install the crystal connector to PoE network cable as shown in Figure 3 16 ...

Page 25: ... connector When making PoE network cables follow the international standard EIA TIA568A or EIA TIA568A to arrange the cables Make sure that the two ends of each network cable use the same standard Step 2 Connect the PoE network cable 1 Diassemble the PG head screw cap and air proof block on the PoE port and pass the network cable through them as shown in Figure 3 17 ...

Page 26: ...e 3 17 Passing the network cable through the PG head screw cap and air proof block 2 Connect the network cable to the network adapter and manually rotate the screw cap to ensure that the lock block adheres to the network cable as shown in Figure 3 18 Figure 3 18 Installing the PG head screw cap and air proof block Step 3 Connect the PoE adapter ...

Page 27: ...ble End 3 3 Installation Check After you install the eA360 perform a hardware installation check and a power on check Prerequisites The eA360 hardware has been installed Procedure Step 1 Check whether the eA360 hardware is correctly installed When performing the hardware check for the eA360 check the items listed in Table 3 4 in order Table 3 4 Hardware installation check of the eA360 No Check Ite...

Page 28: ...h the one on the expansion bolt In addition the fixture must be tightly and firmly attached to the wall and must not wobble when you shake it When checking the cable connections of the eA360 check the items listed in Table 3 5 in order Table 3 5 Cable connection check of the eA360 No Check Item 1 No cable is short circuited or inversely connected 2 The connector of the PoE network cable must be ap...

Page 29: ...items listed in Table 3 6 must be checked during eA360 indicator check Table 3 6 Indicator check No Check Item 1 When the eA360 powers on the POWER indicator is on 2 When the eA360 powers on the RSSI indicator is steady on or blinks If the RSSI indicator is off when the eA360 powers on the signal strength is too weak Check the power supply End ...

Page 30: ...tallation of the eA360 is complete The eA360 starts correctly based on default parameters during power on Procedure Step 1 Start the IE browser enter http 192 168 1 1 in the address bar and press Enter Connect the eA360 from the near end using the Web management page Use Internet Explorer 7 IE7 or later versions Step 2 Log in to the web management page with User name set to default value admin and...

Page 31: ...ired maintenance items and prepare related tools Learning About the Site Information Gather the following site information before going to the eA360 site to perform maintenance Persisting faults and alarms Hardware configuration Natural environment Selecting Maintenance Items Select suitable maintenance items based on the eA360 site conditions Maintenance items must include the following aspects N...

Page 32: ...x 5 Set Packet size and Timeout and select the Enable check box behind Do not Fragment 6 Click Ping 7 Wait until the operation is performed The command output is displayed in the Result box Packet Length indicates the bytes of a sent packet and ranges from 1 to 9 000 bytes Timeout indicates the timeout period of each reply and ranges from 1 to 10 seconds When the CPE does not run properly the Syst...

Page 33: ...014 07 30 Huawei Proprietary and Confidential Copyright Huawei Technologies Co Ltd 29 6 Legal Notice 6 1 Privacy Policy To better understand how we protect your personal information please see the privacy policy at http consumer huawei com privacy policy ...

Page 34: ...ions This section lists the acronyms and abbreviations related to the eA360 Table 7 1 List of acronyms and abbreviations Acronym Abbreviation Full Name 3GPP 3rd Generation Partnership Project CPE Customer Premises Equipment LTE Long Term Evolution MAC Media Access Control PoE Power over Ethernet SIM Subscriber Identity Module URL Uniform Resource Location WAN Wide Area Network ...

Page 35: ...Regulatory Compliance Statement eA360 135 Issue 01 Date 2014 8 14 HUAWEI TECHNOLOGIES CO LTD ...

Page 36: ......

Page 37: ...er All or part of the products services and features described in this document may not be within the purchase scope or the usage scope Unless otherwise specified in the contract all statements information and recommendations in this document are provided AS IS without warranties guarantees or representations of any kind either express or implied The information in this document is subject to chan...

Page 38: ......

Page 39: ...fidential Copyright Huawei Technologies Co Ltd 1 1 1 Regulatory Compliance Statement About This Chapter 1 1 Declaration of Conformity to European Directives 1 1 Declaration of Conformityto European Directives Figure 1 1 Declaration of Conformity to European Directives ...

Page 40: ...1 Regulatory Compliance Statement 1 2 Huawei Proprietary and Confidential Copyright Huawei Technologies Co Ltd Issue 01 ...

Page 41: ...is Chapter 2 1 Regulatory Compliance Standards 2 2 European Regulatory Compliance 2 3 U S A Regulatory Compliance 2 4 Canada Regulatory Compliance 2 5 CISPR 22 Compliance 2 6 China RoHS hazardous substance table 2 7 India RoHS hazardous substance table 2 8 Other Markets 2 1 Regulatory Compliance Standards This product complies with the standards listed in Table 2 1 ...

Page 42: ... Class B z AS NZS CISPR22 Class B z GB9254 Class B z CNS 13438 Class B z IEC61000 3 2 z IEC61000 3 3 z EN61000 6 1 z EN61000 6 3 Safety z IEC 60950 1 z IEC60950 22 z IEC EN41003 z EN 60950 1 z UL 60950 1 z CSA C22 2 No 60950 1 z AS NZS 60950 1 z BS EN 60950 1 z IS 13252 z GB4943 RF z ETSI EN 301 908 Health z ICNIRP Guideline z 1999 519 EC z EN 50385 z EN 62311 z OET Bulletin 65 z IEEE Std C95 1 En...

Page 43: ...ver Station GSM Global System for Mobile communications WLAN wireless local area network ICNIRP International Commission on Non Ionizing Radiation Protection OET Office of Engineering Technology IEEE Institute of Electrical and Electronics Engineers RoHS restriction of the use of certain hazardous substances 2 2 European Regulatory Compliance This product complies with the following European direc...

Page 44: ...ei recycling system the waste can be handled environmentally and the resource can be recycled and reused fully which is also Huawei WEEE stratagem in the word Most of the materials in product are recyclable and our packaging is designed to be recycled and should be handled in accordance with your local recycling policies In accordance with Article 11 2 in Directive 2002 96 EC WEEE products were ma...

Page 45: ...strial Canada and meets the requirements for radiation exposure limits Cet appareil est conçu et fabriqué pour ne pas dépasser les limites d émission pour l exposition à la fréquence radio RF de l énergie fixé par l Industrielle Canada et répond aux exigences en matière de limites d exposition aux rayonnements définies pour un environnement non contrôlé In order to avoid the possibility of exceedi...

Page 46: ...多溴联苯 多溴联苯醚 Frame 〇 〇 〇 〇 〇 Alloy Parts 〇 〇 〇 〇 〇 Power Adapter 〇 〇 〇 〇 〇 Metal Fittings 〇 〇 〇 〇 〇 〇 PCBA 〇 〇 〇 〇 〇 Capacitor 〇 〇 〇 〇 〇 Other electronics 〇 〇 〇 〇 〇 Screen 〇 〇 〇 〇 〇 〇 Solder 〇 〇 〇 〇 〇 Cable 〇 〇 〇 〇 Plastic and Polymer 〇 〇 〇 〇 Label 〇 〇 〇 〇 〇 〇 Battery 〇 〇 〇 〇 〇 〇 〇 表示该有毒有害物质在该部件所有均质材料中的含量均在SJ T11363 2006 标准规定的限量要求以下 表示该有毒有害物质至少在该部件的某一均质材料中的含量超出SJ T11363 2006 标准规定的限量要 求 2 7 India RoH...

Page 47: ...〇 〇 〇 Label 〇 〇 〇 〇 〇 〇 Battery 〇 〇 〇 〇 〇 〇 〇 indicates that the content of the toxic and hazardous substance in all the Homogeneous Materials of the part is below the concentration limit requirement as described in the e waste Management and Handling Rules 2011 indicates that the content of the toxic and hazardous substance in at least one Homogeneous Material of the part exceeds the concentratio...

Reviews: