
Expected Results
1. You have recorded the hardware information.
2. You have recorded the maximum hardware specifications.
Test Result
Remarks
Record the server hardware information and specifications in the
table in section 2.2.1.
4.1.2 Checking Server Hardware Module Marks
Case No.
4.1.2
Test Objective
To verify that the server hardware module marks are clear and
legible.
Test Networking
Diagram
N/A
Prerequisites
The server has been unpacked.
Procedure
1. Check whether the server hardware module marks are clear
and legible, including the silk screens of the ports, buttons,
and indicators on the front and rear panels, and the product
name and model nameplate.
2. Open the chassis cover. Check whether the internal module
layout is suitable, no main component is covered by another
one, no ventilation channel is blocked, and the slots of CPUs,
DIMMs, fan modules, and PCIe cards are clearly marked.
Expected Results
The server hardware module marks are clear and legible, the
internal module layout is suitable, no main component is covered
by another one, and no ventilation channel is blocked.
Test Result
Remarks
4.1.3 Installing the Server
Case No.
4.1.3
Test Objective
To verify that the server can be properly installed in a standard
cabinet.
Test Networking
Diagram
N/A
5288 V5 Server
Acceptance Guide
4 Test Cases and Records
Issue 03 (2019-03-25)
Copyright © Huawei Technologies Co., Ltd.
7