After one fault diagnosis operation is performed, the M2000 creates a fault diagnosis task and
displays the diagnosis progress. After the fault diagnosis is complete, you can obtain the fault
diagnosis report.
If you delete a fault diagnosis task, the corresponding diagnosis report is deleted accordingly.
If you restart the M2000 server, all fault diagnosis tasks and reports are deleted.
Procedure
Step 1
Choose
Configuration
>
Auto Deployment
>
GBTS Auto Deployment
to open the
GBTS
Auto Deployment
window.
Step 2
On the
GBTS List
tab page, select one or multiple commissioning tasks, and then click
.
Alternatively, right-click the tasks, and then choose
Open Monitor Window
from the shortcut
menu.
Step 3
Perform the fault diagnosis.
1.
In the
Monitor
window, select one object or select one alarm of a certain object from the
alarm list in the right pane.
2.
Right-click the object or alarm, and then choose
Diagnose...
from the shortcut menu to set
diagnosis parameters.
After the diagnosis parameters are set, a diagnosis task is added to the diagnosis task list.
The diagnosis task list is located in the lower part of the
Monitor
window.
3.
Right-click a fault diagnosis task in the diagnosis task list, and then choose
Diagnosis
Report...
from the shortcut menu to view the diagnosis results.
Step 4
Perform the following steps to handle an alarm:
1.
Double-click the alarm to be handled, and then click the link in
Reason And Advice
in the
displayed dialog box that shows the alarm details.
2.
Handle the fault according to the alarm reference.
----End
5.5.3 Viewing the GBTS Service Verification Results
This section describes how to view the GBTS service verification results. After the automatic
service verification starts, the M2000 automatically collects the performance data related to
GBTS CS and PS services and checks whether the GBTS services are normal. If the service
verification persists, it is recommended that you view the service verification results to learn the
actual performance data. This ensures the commissioning success.
Prerequisite
The automatic service verification already starts, and you have not confirmed the completion of
the GBTS commissioning yet.
Context
During the service verification, the performance measurement period is the shortest
measurement period supported by the GBTS. By default, the shortest measurement period is 15
minutes. The involved performance counters are as follows:
l
CS services:
SDCCH Verification
and
TCH Verification
5 Commissioning the MBTS in GL or UL Mode on the
M2000
3900 Series Multi-Mode Base Station
Commissioning Guide
5-26
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Issue 02 (2010-07-30)