background image

©HSS Hire Service Group Plc 2020 No. 417/02

76 Talbot Road, Old Trafford, Manchester, M16 0PQ

http://www.hss.com

...any comments?

...any comments?

If you have any suggestions to enable us to improve the 

information within this guide please email your comments 

to [email protected]

Pressure Monitoring

The  pressure  is  monitored  during  pressing  in  the  REMS 

Akku-Press  22V  ACC.  Upon  completion  of  the  pressing 

process,  the  pressure  indicator  LED  lights  white  if  the 

pressure  is  within  specification.  If  this  lights  red,  the 

pressure was less than specified. If it lights red and the 

drive  unit  is  switched  off,  the  pressure  was  greater 

than specified. Hold the reset button until the pressing 

rollers have moved back completely. If the pressure was 

out of specification, a new pressing process can be started 

and  the  pressure  indicator  LED  then  lights  white  again 

during  the  pressing  process.  After  a  dwell  time  of 

approx.  2  minutes,  the  LED  goes  out  but  lights  up 

again,  when  the  drive  unit  is  switched  back  on.  If  the 

pressure indicator LED lights red. it is recommended to 

return the equipment to your local HSS depot.

Never  push  the  equipment  beyond  its  design 

limits.  If it will not do what you want with reasonable 

ease and speed, assume you have the wrong tool for the 

job. Contact your local HSS Hire Shop for advice. Keep the 

equipment clean - you will find this less of a chore if you 

clean it regularly, rather than wait until the end of the 

hire period. 

When  not  in  use,  store  the  equipment  somewhere 

clean, dry and safe from thieves.

 

Disconnect the battery and place with the charger in 

the carry case.

Remove the fitted jaw and place the de-burrer, jaw and 

unit in the carry case ready for return, to your local HSS 

Hire Shop.

FINISHING OFF

EQUIPMENT CARE

Crimping

Open

Fitting

Pipe

Closed

Each  pipe  connector  has  a  pair  of  raised  ridges 

which locate within a recess  in the crimping jaws. One 

ridge for each side of the connector.

Prepare  the  pipe  by  removing  burrs  and  reaming the 

edge with the tool provided. Place the connector onto 

the pipe and place the jaws over the ridge on the pipe 

side of the connector.

Keep the safety inching switch pressed until the pressing 

is finished and the pressing tongs or rings are completely 

closed. After completion of pressing. the drive unit 

switches over automatically to retraction. This is indicated 

by an acoustic signal (click).

Reviews: