Warnings
The installation and assembly operations must always be carried out by specialised
technicians only.
All the lifting and handling operations of the product and its parts must be performed with
extreme care, avoiding impacts that could compromise its operation or damage any coated
parts.
4.2
Overall dimensions and weight of the packed
product
Each single product may be lifted and transported manually. The linear dimensions of the packed
product are indicated on the documents accompanying it.
Summary of Contents for SM 137 D
Page 2: ......
Page 4: ...Information about the publication 4 HSD S p A H5834D0189 fm291119 ...
Page 8: ...Table of contents 8 HSD S p A H5834D0189TOC fm291119 ...
Page 9: ...Preliminaries ...
Page 10: ......
Page 16: ...1 Preliminary information 16 HSD S p A h0101k00a fm291119 ...
Page 20: ...2 Safety information 20 HSD S p A h0115k00a fm291119 ...
Page 21: ...Descriptions ...
Page 22: ......
Page 26: ...3 Main parts 26 HSD S p A h0102k00a fm291119 ...
Page 48: ...5 Installation and commissioning 48 HSD S p A h0104k01a fm291119 ...
Page 49: ...Maintenance ...
Page 50: ......
Page 52: ...6 Maintenance 52 HSD S p A h0107k00a fm291119 ...
Page 53: ...Appendices ...
Page 54: ......
Page 60: ...A Technical characteristics 60 HSD S p A h0124k00a fm291119 ...
Page 62: ...B Disposal 62 HSD S p A h0109k00a fm291119 ...
Page 70: ...Analytical index 70 HSD S p A H5834D0189IX fm291119 ...
Page 71: ......