Locating the frame in the rack
Locating the frame in the rack
Before you power down a frame or service components in a frame, you want to make sure that you identify the correct frame in the data
center.
Procedure
Procedure
1. Connect to the HPE Synergy Console .
2. Sign in to HPE OneView with administrator privileges.
Minimum required privileges for the next step: Infrastructure administrator, Server administrator (for enclosure, server, and frame
link module UID lights), Network administrator (for interconnect UID LED).
3. Navigate to the Enclosures screen and use the UID LED to locate the frame being serviced.
Locating the frame in the rack
47
Summary of Contents for Synergy 12000 Frame
Page 36: ...Customer self repair 36...
Page 37: ...Customer self repair 37...
Page 38: ...Customer self repair 38...
Page 39: ...Customer self repair 39...
Page 40: ...Removal and replacement procedures Removal and replacement procedures 40...
Page 53: ...HPE Synergy Console connections HPE Synergy Console connections 53...
Page 78: ...To replace the component reverse the removal procedure Removing and replacing a rear cage 78...
Page 82: ...Component and LED identification Component and LED identification 82...
Page 84: ...Information pull tabs 84...
Page 88: ...Figure 5 Optional horizontal half shelf Device bay partitions 88...
Page 92: ...Appliance bay numbering Appliance bay numbering 92...
Page 131: ...Specifications Specifications 131...
Page 134: ...Support and other resources Support and other resources 134...