
Install the access panel
IMPORTANT:
After performing a procedure inside the chassis, always install the access panel on the chassis
when complete. Do not operate the chassis for long periods of time with the access panel removed.
Procedure
1.
Place the access panel on top of the chassis.
2.
Slide the access panel toward the front of the chassis. The access panel locks into position.
Power up the cartridge
Review the following information before powering up the cartridge:
• Depending on the cartridge model, the cartridge may be a single-node or a multi-node cartridge.
• Upon installation into the chassis, auxiliary power is automatically provided to the cartridge. Depending
on the chassis autopower setting, nodes may power up automatically upon cartridge installation.
Cartridges can be powered up individually and as a group of all cartridges in the chassis. Choose the
procedure in this section that fits your need.
When entering cartridge commands provided in this section, you can use one command to address
multiple cartridges. Use commas to separate non-contiguous numbers (omit spaces), or a dash to denote
a range (for example, C1,3-9N1-4). For more information about using commands, see the
HPE Moonshot
iLO Chassis Management CLI User Guide
in the Hewlett Packard Enterprise Information Library (
www.hpe.com/info/moonshot/docs
Power up a cartridge remotely
Procedure
1. Log in to the iLO CM firmware
on page 17.
2.
Show the installed cartridges to determine node status:
show node power {C<x>N<y>|all}
3.
Power up the cartridge by issuing the appropriate command:
16
Install the access panel