2. At the rear of the server, plug in the power cord to the power supply.
3. Install the power cord anchors.
4. Secure the cables to the cable management arm.
IMPORTANT: Leave enough slack in each of the cables to prevent damage to the cables when the server is
extended from the rack.
5. Connect the power cord to the AC power source.
Release the cable management arm
Release the cable management arm and then swing the arm away from the rack.