The installation is complete.
Expansion board options
The server has three PCIe4 expansion slots that support different form factor expansion boards. For more information on
the PCIe4 slot specifications, see
PCIe expansion slot definitions.
Installing an expansion board
NOTE: If the slimline primary riser is installed, the expansion board is not supported in slot 2.
NOTE: If the slimline secondary riser is installed, the expansion board is not supported in slot 3.
Prerequisites
Before you perform this procedure, make sure that you have the following items available:
• Expansion board option kit
• Internal and external cabling required by the expansion board
• T-15 Torx screwdriver
Procedure
1.
If installed,
2.
3.
Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4.
Disconnect all peripheral cables from the server.
5.
Remove the server from the rack.
6.
7.
Identify the PCIe slot compatible with the expansion board option.
8.
If installing the expansion board in slot 2 or slot 3:
a. Remove the full-height bracket from the expansion board.
Hardware options installation
87
Summary of Contents for ProLiant DL325 Gen10 Plus
Page 36: ...10 Remove the inner drive cage blank 11 Remove the fan wall covers 36 Operations...
Page 37: ...12 For SFF drive cage remove the cable covers 13 Remove the drive cage latches Operations 37...
Page 38: ...14 Remove the outer drive cage LFF SFF 38 Operations...
Page 52: ...52 Operations...
Page 67: ...3 Remove the drive blank LFF SFF 4 Prepare the drive LFF Hardware options installation 67...
Page 119: ...SFF Cable routing Front I O LFF Cabling 119...
Page 120: ...SFF Cable routing Serial port 120 Cabling...