Extending the server from the rack
To perform this procedure, you will need a T-25 screwdriver.
WARNING: To reduce the risk of personal injury or equipment damage, be sure that the rack is adequately
stabilized before extending a component from the rack.
Procedure
1. To fully extend the long chassis server with the cable management arm, do the following:
NOTE: If the cable management arm option is installed for a short chassis server, you can extend the server without
powering down the server or disconnecting peripheral cables and power cords.
a. If installed, remove the bezel.
c. Disconnect all peripheral cables and power cords.
d. Remove the cables from the cable management arm.
Operations
29
Summary of Contents for ProLiant DL325 Gen10 Plus
Page 36: ...10 Remove the inner drive cage blank 11 Remove the fan wall covers 36 Operations...
Page 37: ...12 For SFF drive cage remove the cable covers 13 Remove the drive cage latches Operations 37...
Page 38: ...14 Remove the outer drive cage LFF SFF 38 Operations...
Page 52: ...52 Operations...
Page 67: ...3 Remove the drive blank LFF SFF 4 Prepare the drive LFF Hardware options installation 67...
Page 119: ...SFF Cable routing Front I O LFF Cabling 119...
Page 120: ...SFF Cable routing Serial port 120 Cabling...